Laserfiche WebLink
February 1,2017 <br /> George M.L.Robinson <br /> o <br /> Hourly Rate $ 139.15 $ 68.31 <br /> Site Traffic Study-Wildcat Mining Corporation <br /> 1. Data Collection <br /> a. Vehicle Characteristics 4 $ 273.24 <br /> b. Trip Generation 4 $ 273.24 <br /> C. Standards Research 2 4 $ 551.54 <br /> d. Road Inventories 8 $ 546.48 <br /> e. Existing and Future Background Volumes 32 $ 2_,185.92 <br /> - --------- ------ <br /> f. Directional Distribution 4 $ _ 273.24 <br /> 2. Traffic Analysis <br /> a. Passenger Car Equivalents___ _ __ 4 $ 273.24 <br /> b. Before and After 18k Equivalent Single Axle Loadings(ESALs) 4 $ 273.24 <br /> -- -- - y- - - ---- -- - - --- -- -3.24 <br /> C. Traffic Operational Anal sis _ 2 16 $ 1,371.26 <br /> Traffic Safety Analysis 2 16 $ 1,371.26 <br /> e. Compliance to County Standards 2 8 $ 824.78 <br /> f. Compliance to CDOT Standards(State Highway Access Code) 2 8 $ 824.78 <br /> 3. Report Preparation 4 24 $ 2,196.04 <br /> 4. Agency Review and Permitting <br /> a. La Plata County ^ �v 8 8 $ 1,659.68 <br /> b. CDOT 8 8 $ 1,659.68 <br /> 5. Public Meetings - 16 16 $ 3,319.36 <br /> $ 17,876.98 <br /> i <br /> Page 3 of 3 <br />