Laserfiche WebLink
-4- <br /> 12. Primary future(Post-mining)land use(check one): <br /> _E_ Cropland(CR) Z Pastureland(PL) �_ General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> r� Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> I Developed Water Resources(WR) F Solid Waste Disposal(WD) <br /> 13. Primary present land use(check one): <br /> Cropland(CR) Pastureland(PL) F General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) I Wildlife Habitat(WL) <br /> F Residential(RS) �_ Recreation(RC) I Industrial/Commercial(IC) <br /> IDeveloped Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): This is a dry mining operation where front end <br /> loaders,and dozers remove material from a terrace deposit and load into the processing plant. <br /> 15. On Site Processing: ✓ Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): Loaders,dozers,track hoes and trucks will be used to <br /> remove material and feed a processing plant that crushes and screens into stockpiles. <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> None <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> of the property that was mined pre-1976 as a site the landowner can use for storage. During mining Colorado <br /> Rackhoe will use it as a storage area for material generated y their excavation business. Iffis ma eria is <br /> recycled and blended with the mined material to create a usable produce. When mining ends the old mine <br /> slopes and disturbed area will be reclaimed. Activities at the site will not increase this conversion extend <br /> the—*f of the mine cn N all material is remeyed-8n the area reele4med. <br />