My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-27_REVISION - M1977493
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2017-07-27_REVISION - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2017 8:15:01 AM
Creation date
7/28/2017 8:03:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
Revision
Doc Date
7/27/2017
Doc Name
Request for Technical Revision
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR26
Email Name
ECS
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final Compensatory Mitigation and Monitoring Plan—Version 2.0 <br />Climax Mine Overburden Storage Facility Expansion (SPK-2013-00045) <br />March 2017 Bikis Water Consultants, a division of SGM Page 27 <br />2. Incorporate the entire mitigation site into the current Climax reclamation performance <br />bonds held by DRMS. Climax is currently bonded for $78MM with DRMS to cover the <br />third-party cost to complete mine site reclamation. Climax could incorporate the specific <br />technical construction and monitoring requirements of the Lake Irwin site into the mine <br />reclamation plan as a Technical Revision to the Climax Reclamation Permit. Once <br />approved by DRMS, the mitigation site would fall under the reclamation performance <br />bond held by DRMS. This financial assurance mechanism was used for the wetland <br />mitigation site constructed for the Climax Property Discharge Water Treatment Plant <br />NWP39 (Corps permit file SPK-2011-00907). A copy of the DRMS letter incorporating <br />the mitigation site into the permit and providing financial assurance is in Appendix F. <br />16.0 REFERENCES <br />Bikis Water Consultants, LLC. Wetland Delineation for McNulty Gulch Climax Mine, Summit <br />County, Colorado - Revised. July 2013. <br />Bikis Water Consultants, a division of SGM. Section 404 Alternatives Analysis - McNulty Gulch <br />Overburden Storage Facility (OSF) Expansion (Corps Project No. PSK-2013-00045). November <br />2015. <br />Brinson, M. R. D. A Hydrogeomorphic Classification for Wetlands. Wetlands Research Program <br />Technical Report WRP-DE-4. 1993. <br />Cowardin et al. Classification of Wetland and Deep Water Habitats of the United States. U.S. <br />Fish and Wildlife Service FWS/OBS 79/31. 1979. <br />Johnson, B., M. Beardsley, and J. Doran. Functional Assessment of Colorado Wetlands <br />FACWet Method) Version 3.0. Colorado State University and Colorado Department of <br />Transportation. 2013. <br />Natural Resources Conservation Service. Field Indicators of Hydric Soils in the United States, A <br />Guide for Identifying and Delineation Hydric Soils, Version 7.0. In cooperation with the National <br />Technical Committee for Hydric Soils. 2010. <br />Natural Resources Conservation Service. National List of Hydric Soils. 2012. <br />U.S. Army Corps of Engineers. Final 2015 Regional Compensatory Mitigation and Monitoring <br />Guidelines. South Pacific Division USACE. <br />http://www.spd.usace.army.mil/Portals/13/docs/regulatory/mitigation/MitMon.pdf>. 2015
The URL can be used to link to this page
Your browser does not support the video tag.