Laserfiche WebLink
FINAL COMPENSATORY MITIGATION AND <br />MONITORING PLAN - VERSION 2.0 <br />CLIMAX MINE OVERBURDEN STORAGE <br />FACILITY EXPANSION (SPK-2013-00045) <br />Prepared for: <br />Mr. Raymond Lazuk <br />Climax Molybdenum <br />11236 Highway 91 - Fremont Pass <br />Climax, CO 80429 <br />Prepared by: <br />Bikis Water Consultants, a division of SGM <br />info@BikisWater.com <br />www.BikisWater.com <br />March 2017