My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-27_REVISION - C1981041 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2017-07-27_REVISION - C1981041 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2017 9:02:33 AM
Creation date
7/27/2017 7:10:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
7/27/2017
Doc Name Note
Proposed Decision Findings & Cost Estimate (Revised)
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Snowcap Coal Company
Type & Sequence
SL10
Permit Index Doc Type
Findings
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Borehole Worksheet Cont'd Task # TTT Page 17 of 18 <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: Mobilize Equipment for Site Maintenance <br />Site: Roadside Portals Permit Action: SL10 Permit/Job#: C1981041 <br />PROJECT IDENTIFICATION <br />Task #: 206 <br />Date: 6/19/2017 <br />User: JHB <br />State: Colorado <br />County: Mesa <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C041-206 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON -HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, 400 HP (2ND <br />HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER (25T, 50T, <br />AND 100T) <br />Available Rig Capacities <br />0-25 Tons <br />26-50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine Description <br />Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />$87.00 <br />Unit <br />Cost/hr/ unit <br />Cost/hr/unit <br />Size <br />Cost/hr/ fleet <br />Cost/hr/ fleet <br />Cost/ fleet <br />(TONS) <br />Cat D3K LGP - 3P <br />9.20 <br />$21.29 <br />$88.67 <br />2 <br />$219.92 <br />$177.34 <br />$0.00 <br />Subtotals: 1 $219.92 $177.34 $0.00 <br />ROADABLE EQUIPMENT: <br />Machine Description <br />Total Cost/hr/ unit <br />Fleet Size <br />Haul Trip <br />Cost/hr/ fleet <br />Return Trip <br />Cost/hr/ fleet <br />Flatbed Truck, 6x4, 45K GVW <br />$43.50 <br />2 <br />$87.00 <br />$87.00 <br />Subtotals: 1 $87.00 $87.00 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one-way travel distance: <br />Average Travel Speed: <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />GRAND JUNCTION <br />25.00 miles <br />40.00 mph <br />$716.50 <br />$108.75 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.