My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-27_REVISION - C1981041 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2017-07-27_REVISION - C1981041 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2017 9:02:33 AM
Creation date
7/27/2017 7:10:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
7/27/2017
Doc Name Note
Proposed Decision Findings & Cost Estimate (Revised)
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Snowcap Coal Company
Type & Sequence
SL10
Permit Index Doc Type
Findings
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Borehole Worksheet Cont'd Task # TTT Page 12 of 18 <br />SCRAPER TEAM WORK <br />Task description: Topsoil Light Use Road 1; (1.9 acres of Area #30) <br />Site: Roadside Portals Permit Action: SL10 Permit/Job#: C1981041 <br />PROJECT IDENTIFICATION <br />Task #: 203 <br />Date: 6/19/2017 <br />User: JHB <br />State: Colorado <br />County: Mesa <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 623G <br />-Dozer: NA <br />COSTShift basis: 1 per day <br />Abbreviation: None <br />Filename: C041-203 <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Scraper Work Team Sunnort Eauipment Maintenance Eauipment <br />Total work team cost/hour: $422.86 <br />MATERIAL QUANTITIES <br />Initial volume: 766 CCY <br />Loose volume: 766 LCY <br />Source of estimated volume: 3" over 1.9 acres <br />Source of estimated swell factor: Cat Handbook <br />h[1111911'd 9 till 11LO Y [I],I <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader Water Tru <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$84.05 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$85.92 <br />NA <br />NA <br />NA <br />NA <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$41.46 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$211.43 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$422.86 <br />Support: <br />$0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $422.86 <br />MATERIAL QUANTITIES <br />Initial volume: 766 CCY <br />Loose volume: 766 LCY <br />Source of estimated volume: 3" over 1.9 acres <br />Source of estimated swell factor: Cat Handbook <br />h[1111911'd 9 till 11LO Y [I],I <br />Material weight: <br />1,600 lbs/LCY <br />Material description: <br />Top Soil <br />Rated Payload: <br />55,200 pounds <br />Payload Capacity: <br />34.50 LCY <br />Swell factor: 1.000 <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />18.00 <br />LCY <br />Heaped Volume: <br />23.00 <br />LCY <br />Average Volume: <br />20.50 <br />LCY <br />Adjusted Capacity: <br />20.50 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.