Laserfiche WebLink
Borehole Worksheet Cont'd Task # TTT Page 5 of 18 <br />Penstemon, Palmer <br />0.25 <br />5.53 <br />$13.63 <br />Primrose, Missouri Evening <br />0.50 <br />2.03 <br />$28.50 <br />Greasewood, Black <br />1.00 <br />140.45 <br />$19.00 <br />Kochia, Forage Prostrate <br />0.25 <br />35.11 <br />$2.25 <br />Totals Seed Mix <br />20.20 <br />243.50 <br />$312.90 <br />Annliention <br />Description <br />Cost /Acre <br />Drill Seeding (DRMS Survey Cost) <br />$232.00 <br />Total Seed Application Cost/Acre <br />$232.00 <br />MULCHING and MISCELLANEOUS <br />Materials <br />Description <br />Units / <br />Acre <br />Unit <br />Cost / Unit <br />Cost /Acre <br />Straw, delivered {MEANS 3125 14.16 1200) <br />2.00 <br />TON <br />$261.00 <br />$522.00 <br />Total Mulch Materials Cost/Acre <br />$522.00 <br />Annlication <br />Description <br />Cost /Acre <br />Crimping, with tractor {DMG survey data) <br />$66.02 <br />Power mulcher (MEANS 32 91 13.16 0350) <br />$99.32 <br />Total Mulch Application Cost/Acre <br />1 $165.34 <br />NURSERY STOCK PLANTING <br />No / Planting Fertilizer <br />Common Name Acre Type and Size Cost Pellet Cost Cost /Acre <br />Totals Nursery Stock Cost / Acre I $0.00 <br />JOB TIME AND COST <br />No. of Acres: 0.5 Cost /Acre: $1,483.46 <br />Estimated Failure Rate: 0.3% Cost /Acre*: $1,483.46 <br />*Selected Replanting Work Items: FERTILIZING,TILLING,SEEDING,MU <br />LCHING <br />Initial Job Cost: <br />$741.73 <br />Reseeding Job Cost: <br />$2.23 <br />Total Job Cost: <br />$744 <br />Job Hours: <br />3.40 <br />CIRCES Cost Estimating Software <br />