My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-27_REVISION - C1981041 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2017-07-27_REVISION - C1981041 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2017 9:02:33 AM
Creation date
7/27/2017 7:10:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
7/27/2017
Doc Name Note
Proposed Decision Findings & Cost Estimate (Revised)
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Snowcap Coal Company
Type & Sequence
SL10
Permit Index Doc Type
Findings
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Roadside Portals <br />PROJECT IDENTIFICATION <br />Task #: SL10 <br />Date: 6/19/2017 <br />User: JHB <br />COST SUMMARY WORK <br />reclamation cost post SL10 <br />Permit Action: SL10 <br />State: Colorado <br />County: Mesa <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: C1981041 <br />Abbreviation: None <br />Filename: C041-SL10 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />121 <br />131 <br />132 <br />200 <br />201 <br />203 <br />204 <br />205 <br />206 <br />tr69 <br />Plug and Seal Boreholes <br />BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />0.00 <br />$3,525.71 <br />$744.00 <br />$5,660.00 <br />$26.00 <br />$17.00 <br />$435.00 <br />$342.76 <br />$5,628.00 <br />$825.00 <br />$34,470.00 <br />Drill Seed Upland Seed Mix on Mine Site (all area <br />PII) <br />REVEGE <br />3.40 <br />Broadcast Seed Upland Mix on Steep Areas (-2.9 <br />ac. SL 10) <br />REVEGE <br />9.80 <br />Spread topsoil on .3 acre conveyor corridor (Area <br />#27) <br />DOZER <br />0.11 <br />Spread topsoil over .2 acres for Substation A (Area <br />#28) <br />DOZER <br />0.07 <br />Topsoil Light Use Road 1; (1.9 acres of Area #30) <br />SCRAPERI <br />1.03 <br />D3 Maintenance over Liability Period (-SL10 4.0 <br />ac) <br />SITEMAINT <br />ENANCE <br />25.10 <br />Mobilize Equipment for Remaining Reclamation <br />MOBILIZE <br />3.85 <br />Mobilize Equipment for Site Maintenance <br />MOBILIZE <br />3.50 <br />costs assoc. with TR69 repairs <br />NA <br />10.00 <br />SUBTOTALS: <br />56.86 <br />$51,674 <br />INDIRECT COSTS <br />$1,043.81 <br />OVERHEAD AND PROFIT: <br />$542.58 <br />Liability insurance: <br />2.02 <br />Performance bond: <br />1.05 <br />Job superintendent: <br />23.43 <br />Profit: <br />10.00 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Total= <br />$1,043.81 <br />Total = <br />$542.58 <br />Total= <br />$1,711.56 <br />Total = <br />$5,167.40 <br />TOTAL O & P = <br />$8,465.35 <br />CONTRACT AMOUNT (direct + O & P) = <br />$60,139.35 <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and/or contract/bid preparation: <br />4.25 <br />Total = <br />$2,555.92 <br />Reclamation management and/or administration: <br />5.00 <br />$3,006.97 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$14,028.24 <br />TOTAL BOND AMOUNT (direct + indirect) = <br />$65,702.24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.