Laserfiche WebLink
11 <br />Roadside Portals C1981-041 SL10 Findings <br />Roadside North Portal <br />Mine Facilities and <br />Stockpile Area (not <br />including 2.5 acres for <br />Substation G, Topsoil <br />22 <br />Pile #1, the reclaimed <br />24.0 <br />0.0 <br />0.0 <br />0 <br />portion of the old <br />upper diversion ditch, <br />and the reclaimed <br />flume area at the end <br />of the old upper <br />diversion ditch <br />Roadside North Portal <br />Mine Facilities -Pond <br />13 (0.6 acres), Topsoil <br />Pile #1 (0.6 acres), <br />22 <br />and portion of the old <br />2.0 <br />0.0 <br />0.0 <br />0 <br />upper diversion ditch <br />and the flume area at <br />the end of the upper <br />diversion ditch (0.8 <br />acres <br />22 <br />Substation G <br />0.6 <br />0.0 <br />0.0 <br />0 <br />0.3 acres <br />that met <br />Phase III <br />revegetation <br />criteria but <br />were <br />23 <br />Substation B <br />0.3 <br />0.0 <br />0.0 <br />withheld <br />due to <br />overlying <br />potentially <br />affected <br />underground <br />workings. <br />24 <br />2 West Portals <br />0.7 <br />0.0 <br />0.0 <br />0 <br />Cameo Refuse <br />25 <br />Disposal Area Topsoil <br />2.9 <br />0.0 <br />0.0 <br />0 <br />Piles <br />26 <br />Conveyor Corridor <br />2.7 <br />0.0 <br />0.0 <br />0 <br />(July 2003) <br />27 <br />Conveyor Corridor <br />1.6 <br />0.0 <br />0.3 <br />0.3 <br />(March 2004) <br />28 <br />Substation A <br />0.2 <br />0.0 <br />0.2 <br />0.2 <br />11 <br />Roadside Portals C1981-041 SL10 Findings <br />