Laserfiche WebLink
-2- <br />10. Primary Mine Entrance Location (report in either Latitude/Longitude OR UTM): <br />Latitude/Lonaitude: <br />Example: (N) 390 44' 12.98„ <br />(W) 1040 59' 3.87" <br />Latitude (N): deg -a __ min 0— see-.) 9 (2 decimal places) <br />Longitude (W): deg 10 3' min 20 sec _L5_. 0 7 (2 decimal places) <br />OR <br />Example: (N) 39.736910 <br />(W) -104.98449- <br />Latitude (N) (5 decimal places) <br />Longitude(W) (5 decimal places) <br />OR <br />Universal Tranverse Mercator (UTM) <br />Example: 201336.3 E NAD27 Zone 13 <br />4398351.2 N <br />UTM Datum (specify NAD27, NAD83 or WGS 84) Nad 83 <br />Easting <br />Northing <br />12 <br />Zone <br />l 1 _ <br />Primary Future(Post-mining) Land Use check only ane : <br />❑ Cropland(CR) E Pastureiand(PL) Q General Agriculture(GA) <br />❑ Rangeland(RL) ❑ Forestry(FR) ❑ Wildlife Habitat(WL) <br />0 Residential(RS) ❑ Recreation(RC) El Industrial/Commercial(1C) <br />© Developed Water Resources(WR) El Solid Waste Disposal(WD) <br />i2. Primary Present Land Use check only one): <br />❑ Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />❑ Rangeland(RL) Forestry(FR) ❑ Wildlife Habitat(WL) <br />13 Residential(RS) _n Recreation(RC) <br />❑ Developed Water Resources(WR) <br />13. Estimated Be innin Date of Contract: <br />fj Industrial/Commercial(1C) <br />0 Mining(MN) <br />July 1 2010 <br />l ,.l Estimated completion date of contract. .fit- rt . 2rLl <br />