My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-20_INSPECTION - C1981028
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981028
>
2017-07-20_INSPECTION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2017 12:48:14 PM
Creation date
7/24/2017 7:15:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Inspection
Doc Date
7/20/2017
Doc Name
Inspection Report
From
DRMS
To
Coors Energy Company
Inspection Date
7/20/2017
Email Name
RAR
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 July, 2017 C-1981-028/Keenesburg Strip Mine RAR <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 0 <br /> <br /> Page 3 of 4 <br /> <br />TOPSOIL - Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4), Storage and Protection 4.06.3, <br />Redistribution 4.06.4: <br />o No soil movement was opserved on the topsand piles. Overall, topsand piles appeared stable and <br />shaped to the angel of repose with adequate vegetation holding the soil. <br /> <br /> <br />Photo 1: Looking west, across the pit. This area is actively <br />being backfilled to approximate original contour. The area <br />to the right in the distance has achieved AOC. <br /> <br />BACKFILLING and GRADING – Rule 4.14 <br />General Requirements: <br />o Backfilling and grading appears to be <br />proceeding as per approved post mining land <br />use, achieving approximate original contour. <br />o Overburden placement is progressing from <br />south east to north west. <br />o Overburden has been placed in area 24 <br />achieving approximate original contour <br />(AOC). Next step here is topsand placement <br />once the pit has been completely filled in <br />(Photo 2). <br />o Overburden placement and leveling was <br />taking place at time of inspection. <br />o The equipment grader was working to smooth the ground for overburden placement. <br /> <br />Photo 3: Looking south west across area that has achieved AOC. Once the pit is filled in <br />topsand will be placed to the height of the crest in the distance, creating a domed formation to <br />assure positive drainage away from the pit. <br /> <br />REVEGETATION - Rule 4.15
The URL can be used to link to this page
Your browser does not support the video tag.