Laserfiche WebLink
Page 4 of 5 <br /> 12. Total acres in various stages of reclamation, since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: V seeded w/ w/topsoil mulched w/ <br /> approved mix: 2 replaced: /Z, approved mulch: 141 <br /> Total acres Total acres Topsoil Mulch application <br /> graded: fertilized w/ ®� replacement rate(tons/ac): ,p <br /> apvd fertilizer: /" )9 depth(in.): le ,7 <br /> Seed ar,//Q Fertilizer Mulch <br /> application application �//,� applications <br /> method: Nl hr"'* of%Pd1 method: 11 '' method: <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? ES NO N/A <br /> If"YES", indicate the weed species, control area, control type, application rate and treatment date on the report map. <br /> 14. Is adequate topsoil reserved for reclamation, based on your approved permit? ES NO N/A <br /> If"NO", please explain: <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? ES NO N/A <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of the State <br /> Engineer(Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES N/A <br /> 17. Are all hazardous materials stored within approved spill containment structures? YES NO N/A <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation? YES NO N/A <br /> 19. Is your basis for legal right to enter still valid? YES NO <br /> 20. Does your permit require you to submit monitoring information annually? YES NO N/A <br /> If"Yes", please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials(C.R.S. 34-32-116 or 34-32.5-116),attach a map to this report that accurately depicts the permit <br /> boundary, current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br /> MAP ATTACHED: ye 3, <br /> 3 O • 14-195 <br /> XJ <br /> P <br /> Pec;�q <br /> fhAA yG <br />