Laserfiche WebLink
RECLAMATION COST SUMMARY Date: 7/5/2017 <br /> Site: Fedinec Pit Permit No.: <br /> Description: Reclaim site <br /> DIRECT COSTS <br /> TASK LIST <br /> Hourly <br /> Task# Description Task Hours Cost Costs <br /> 01 Mobilize reclamation crew and equipment 2.93 $ 2,941.31 <br /> Rip benches, stockpile areas and access roads <br /> approximately 3 acres-dozer with a ripper <br /> 02 6.06 $ 1,291.39 $ 213.10 <br /> Reduce slopes to a 3:1 slope and rough finish <br /> 03 grade-dozer with a ripper 13.61 $ 3,202.98 $ 235.34 <br /> Distribute 7,720 cubic yards of topsoil over <br /> 04 distrubed areas-dozer 26.79 $ 3,770.16 $ 140.73 <br /> 05 Spread topsoil-dozer 7.77 $ 1,553.15 $ 199.89 <br /> See <br /> 06 Revegetate 10 acres of affected area 10 acres 1 $ 17,270.00 attached <br /> Place 2500 ft of straw wattles @$20/20ft <br /> 07 lengthes 8 $ 3,484.00 $ 123.00 <br /> SUBTOTAL $ 33,512.98 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT <br /> Liability insurance: 2.02% $ 676.96 <br /> Performance bond: 1.05% $ 351.89 <br /> Job superintendent 10 hours $ 750.00 <br /> Profit: 10% $ 3,351.30 <br /> CONTRACT AMOUNT(DIRECT AND 08,P) $ 38,643.12 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT <br /> Engineering work and/or contract/bid preparation 0.00% $ - <br /> Reclamation management and/or administration 5.00% $ 1,932.16 <br /> TOTAL BOND AMOUNT $ 40,575.28 <br />