Laserfiche WebLink
22 March, 2017 C-1981-010/Trapper Mine RAR <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 11 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 7 of 11 <br /> <br /> Photo 5: East Flume #1 White PVC pipe comprises mitigation for burrowing mammals. <br /> <br /> <br /> Photo 6: Oak Ponds, looking north. <br /> <br />o East Middle Flume #1(photo 4 <br />above), held water. Inlet <br />armoring appeared to function <br />adequately. The discharge <br />through spillway was a trickle, <br />did not arrive at the flume and, <br />appeared clear. <br />o East flume #1 (photo 5), held a <br />small amount of water and was <br />not discharging. Consider <br />armoring the inlet. The flume <br />was inspected and appeared to be <br />functioning adequately. <br />o Spillways appeared to be operating <br />effectively with the exceptions of <br />those noted in pond maintenance table <br />above. <br /> <br /> <br />