Laserfiche WebLink
Battle Mountain Resources Inc. <br /> San Luis Project <br /> CMLRB Permit No.M-88-112 <br /> June 2017 Monthly Report <br /> Page 3 <br /> Table 2—June 2017 Tailing Disposal Area Piezometer Depth to Water <br /> Measurements(continued) <br /> Piezometer Date Depth to Water Total Depth (ft) Volume of <br /> (feet) Water ft <br /> P10 6/29/17 57.55 58.30 0.75 <br /> PH 6/29/17 41.37 41.80 0.43 <br /> P 12 6/29/17 41.67 41.71 0.04 <br /> P 13 1 6/29/17 1 40.99 41.34 1 0.35 <br /> P 14 6/29/17 41.21 41.24 0.03 <br /> P 15 6/29/17 40.84 41.10 0.26 <br /> Table 3 below provides the calendar year 2017 sludge management for the San Luis site. <br /> Table 3 -Water Treatment Plant Sludge Management Year to Date. <br /> Date Quantity Sludge Management <br /> July 2016 104 tons Sludge transferred from drying pad to tailings <br /> impoundment. <br /> Should you have any questions or comments, please do not hesitate to contact either myself at <br /> (719)379-0798 or Mr. Larry Fiske at(303) 837-5676. <br /> 'ncerely, ` <br /> I' <br /> Julio F. Madrid <br /> Si. Supervisor Legacy Sites Reclamation and Closure <br /> Cc: Larry Fiske <br /> File <br />