My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-13_HYDROLOGY - M1988112
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2017-07-13_HYDROLOGY - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2020 4:18:25 AM
Creation date
7/13/2017 4:32:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Hydrology
Doc Date
7/13/2017
Doc Name
Water Monitoring - Groundwater
From
Battle Mountain Resources
To
DRMS
Annual Report Year
2017
Report Quarter_Month
Jun
Email Name
LJW
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> a <br /> c---JUL 13 2017 <br /> - ✓ DNI"OF RECLAMATION <br /> BATTLE MOUNTAIN RESOURCES, INC. Mw1NGAND&A M <br /> July 10,2017 <br /> Mr. Wally Erickson/Mr. Lucas J. West <br /> State of Colorado <br /> Division of Reclamation,Mining and Safety <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> Re: Battle Mountain Resources Inc. <br /> San Luis Project <br /> CMLRB Permit No.M-88-112 <br /> June 2017 Monthly Report I,,- <br /> Dear Mr. Erickson and Mr. Lucas: <br /> The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. (BMRI), <br /> San Luis Project for the month of June 2107. <br /> During the month of June, Mr. Erickson, Mr. Lucas and Mr. Means made a site visit to the San Luis- <br /> Battle Mountain Project in order to conduct a complete site inspection and also for preparation of Mr. <br /> Lucas taking over as site inspector for CDRMS. <br /> Surface and ground water monitoring and analysis were completed for all required sites during the month <br /> per the terms and conditions of the TR-32 Quality Assurance and Quality Control(QA/QC)plan. <br /> Vacuum on the tailing lysimeters was verified on June 29`h, no water was present for sampling and <br /> subsequent analysis. <br /> Depths to water were collected for the tailing impoundment main embankment piezometers and the West <br /> Pit monitoring wells on June 30`'. The June tailing impoundment piezometer measurements identified <br /> these installations were either dry or contained less than 12 inches of water as illustrated in Table 2. <br /> Tables 1 and 2 below identify the depth to water measurements collected for each of the site monitoring <br /> wells, piezometers and lysimeters as required by the terms and conditions of the TR-32 QA/QC plan. <br /> The leak detection system was measured on June 29`h. A total of 870 gallons of water was excavated from <br /> the leak detection system yielding a monthly average of 30 gpad. The tailings pond under-drain measured <br /> 40 gpm. <br /> During the month of June,the West Pit water treatment plant operated efficiently discharging a total of <br /> 8,831,999 gallons (27.11 acre-feet)of water to Rito Seco Creek and a total of 1,033,800 gallons(3.17 <br /> acre-feet)of water was transferred from the West Pit to the tailings impoundment. Seepage along Rito <br /> Seco Creek remained dry during the month. <br /> P.O.Box 310 • San Luis,Colorado 81152-0310 • (719)379-0798 • Fax(719)379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.