My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-13_REPORT - M1999002
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1999002
>
2017-07-13_REPORT - M1999002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2020 4:28:56 AM
Creation date
7/13/2017 4:31:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
REPORT
Doc Date
7/13/2017
Doc Name
Annual Fee/Report/Map
From
Solvay Chemicals
To
DRMS
Annual Report Year
2016
Email Name
THM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> Well 29-24: Commercial Phase Production Well Reclaimed in 2014 seeded 0.35 acres <br /> Well 29-26: Commercial Phase Production Well Reclaimed in 2014 seeded 0.29 acres <br /> Well 29-28: Commercial Phase Production Well Reclaimed in 2014 seeded 0.47 acres <br /> Well 29-68: Commercial Phase Production Well Reclaimed in 2014 seeded 0.31 acres <br /> Well 20-26: Commercial Phase Production Well Reclaimed in 2015 seeded 0.14 acres <br /> Well 20-74: Commercial Phase Production Well Reclaimed in 2015 seeded 0.74 acres <br /> Well 20-33: Commercial Phase production Well Reclaimed in 2015 seeded 0.39 acres I <br /> Well 29-34: Commercial Phase Production Well Reclaimed in 2015 seeded 1.15 acres <br /> Well 29-78: Commercial Phase Production Well Reclaimed in 2015 seeded 0.57 acres <br /> Well 29-27: Commercial Phase Production Well Reclaimed in 2015 seeded 1.17 acres <br /> Well 20-19: Commercial Phase Production Well Reclaimed in 2015 seeded 0.49 acres <br /> Well 20-76: Commercial Phase Production Well Reclaimed in 2015 seeded <br /> Well 29-29: Commercial Phase Production Well Reclaimed in 2015 seeded 0.55 acres <br /> 0.55 acres <br /> Remaining well pads, building pads,ancillary roads,and main well field road 2016 19.57 acres <br /> seeded <br /> T*W acres seeded with approved snd ndx <br /> Total acres fertilized with approved fertilizer 19.8 acres <br /> Total acres with topsoil replaced 31.16 acres <br /> Topsoil replacement depth (in) 6—10" <br /> Total acres mulched with approved mulch 0 acres <br /> Mulch application rate (tons) N/A <br /> Seed application method No till drill seeding(pre-winter) <br /> Fertilizer application method Broadcast when used <br /> Mulch application method No mulch used <br /> 13. Is weed control being conducted in accordance with an approved <br /> Weed Control Plan? Weed control is being conducted. Evaluations <br /> are done every year periodically through summer and fall. Noxious <br /> weeds defined by Rio Blanco County are primary focus. In early <br /> summer(June 2015 thistle plants were identified and treated with <br /> herbicide in the rosette stage on all production well pads reclaimed YES NO N/A <br /> in 2014 field season. In late June 2016 all reclaimed production well <br /> pads were spot sprayed. Back pack spraying equipment is now used <br /> to access all of the reclaimed pads and the individual thistle plants <br /> are targeted. Large mature thistle are removed and disposed of as <br /> spraying is not effective in control at this stage. <br /> 14. Is adequate topsoil reserved for reclamation, based on your <br /> approved permit? If"No", please explain: All topsoil placed back on YES NO N/A <br /> intended land area none presently held in reserve. <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with <br /> Rule 3.1.9(1)? If"No", please explain: All topsoil replaced for YES NO N/A <br /> reclamation. <br /> 16. If mining has exposed groundwater, is the site in compliance with <br /> the approved mining plan and Office of the State Engineer (Well YES NO N/A <br /> Permit, S.W.S.P., and/or Permanent Augmentation Plan)? <br /> 17. Are all hazardous materials stored within approved spill YES NO N/A <br /> containment structures? No materials stored on site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.