Laserfiche WebLink
TABLE 3 -Continued <br /> Well Status Date Plugged & Comment <br /> Abandoned <br /> 20 2 Plugged & 6/14/04 Test mine well continued as production well in commercial <br /> Abandoned phase. Well pad and road contoured and reseeded. <br /> Plugged & Test mine production well never operated in commercial <br /> 20-3 Abandoned 6/17/04 phase. Well was on test mine pad.Test mine pad reclaimed <br /> by December 2016. <br /> Ground water Well plugged and Ground water monitoring well used for levels only. On pad <br /> 20-4A monitoring well abandoned 2016 with 20-413. Upper aquifer ground water monitoring well (A <br /> Groove)Well pad and road reclaimed by December 2016. <br /> 20-46 Ground Water Well plugged and Lower aquifer ground water monitoring well (B Groove)Well <br /> monitoring well abandoned 2016 pad and road reclaimed by December 2016. <br /> Ground Water Well plugged and Upper aquifer monitoring well (Uinta) pad. Road is two lane <br /> 20-5 monitoring well abandoned 2016 track leading to TDR subsidence well at 20-12. Area <br /> reclaimed with 20-11 and 20-12 production wells. <br /> Plugged & Former Class I Disposal Well in service during test mining <br /> 20-6 Abandoned 10/11/00 phase only. Well pad and road contoured and reseeded <br /> 0.8 acres in 2000. Pad reseeded in 2005—0.2 acres. <br /> Upper aquifer monitoring well (Uinta). Well was former <br /> Ground Water Well plugged and supply well for test mine and was situated on test mine pad. <br /> 20 8 monitoring well abandoned 2016 No separate top soil pile. Well plugged and abandoned. <br /> Site reclaimed by December 2016 with Test Mine pad. <br /> Lower aquifer monitoring well (13 Groove). Well installed to <br /> Ground Water Well plugged and monitor down gradient of 20-6 Class I Disposal Well during <br /> 20 9 monitoring well abandoned 2016 test mine. Continued in commercial phase. Well plugged <br /> and abandoned. Reclamation of site and road completed by <br /> December 2016. <br /> 20-10 Ground Water Well plugged and Upper aquifer monitoring well (Uinta). Well pad and road <br /> monitoring well abandoned 2016 reclaimed. Reclamation completed by December 2016. <br /> 20-11 Plugged & 6/16/04 Well pad and road contoured and reseeded. Approximately <br /> Abandoned 0.4 acres reclaimed 2005. <br /> Plugged & Well pad and road contoured and reseeded. Approximately <br /> Abandoned TDR 0.2 acres reclaimed 2005. TDR well cut below ground <br /> 20-12 Subsidence 6/17/04 surface and area reclaimed by December 2016 <br /> Monitoring Cable <br /> Installed <br /> Plugged & Test mine well continued as production well in commercial <br /> 20-14 Abandoned 7/9/04 phase. Well pad and road contoured and reseeded. <br /> Approximately 0.5 acres reclaimed in 2005. <br /> Plugged & 10/8/2016 SS Well plugged and abandoned. Well pad and road reclaimed. <br /> 20-19 Abandoned 12/17/08 LS 0.49 acres in 2015. <br /> 20-30 Plugged & 9/7/04 Well pad and road contoured and reseeded. Approximately <br /> Abandoned 0.21 acres reclaimed in 2014. <br /> 20-31 Plugged & 9/7/04 Well pad and road contoured and reseeded. Approximately <br /> Abandoned 0.42 acres reclaimed in 2014. <br /> 20-32 Plugged & 9/6/04 Well pad and road contoured and reseeded. Approximately <br /> Abandoned 0.46 acres reclaimed in 2014. <br /> 20-33 Plugged & 9/2/04 10/24/14 Well plugged and abandoned. Well pad and road reclaimed <br /> Abandoned 0.39 acres in 2015. <br /> Solvay Chemicals, Inc.. 14 <br /> DRMS Annual Report <br /> July 12,2017 <br />