My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-03_PERMIT FILE - C1980004 (22)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980004
>
2017-02-03_PERMIT FILE - C1980004 (22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2017 8:44:19 AM
Creation date
7/13/2017 8:40:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Permit File
Doc Date
2/3/2017
Section_Exhibit Name
Appendix P Water Depletion Estimates
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
United States Department of the Interior <br />°r OFFICE OF SURFACE MINING <br />Reclamation and Enforcement <br />Western Region Office <br />1999 Broadway, Suite 3320 <br />Denver, CO 80202-3050 <br />December 8, 2011 <br />Ms. Pam Repp, Acting Western Colorado Supervisor <br />U.S. Fish and Wildlife Service <br />Ecological Services <br />Western Colorado Office <br />764 Horizon Drive, Building B <br />Grand Junction, Colorado 81506-3946 <br />APPENDIX P <br />CO -0026 <br />RE: McClane Canyon and Fruita Loadout Facility Biological Assessment and Addendum <br />#2 Corrections <br />Dear Ms. Repp: <br />This letter is to provide corrections and clarification language for the McClane Canyon Mine and <br />Fruita Loadout Facility Biological Assessment (BA) and the Addendum #2. There are three <br />issues that were identified subsequent to USFWS Biological Opinion (BO) dated November 16, <br />2011 (ES-6-RO-95-F-001-GJ418, TAILS 06E24100 -2012-F-0009, 65413-2011-B-0022). None <br />of the corrections and clarification language would require revisions to the BA conservation <br />measures. Also, Mr. Terry Ireland (USFWS-Grand Junction) was contacted regarding this matter <br />and he gave verbal approval that no further documentation, other than this letter, would be <br />required for the corrections and clarification language. <br />The following information shows the corrections and clarification language: <br />1. The BA (cover letter and page 1) — states that "McClane Canyon Mine (Mine), owned <br />and operated by CAM -Colorado, LLC (CAM) in Garfield County, provided 280,000 <br />tons of coal per year to the Cameo Power Plant located in Mesa County." <br />Correction: McClane Canyon Mine is owned by CAM Colorado, LLC, but is operated by <br />McClane Canyon Mining, LLC. The BA cover letter and page 1 sentence should read: <br />"McClane Canyon Mine (Mine), owned by CAM Colorado, LLC and operated by <br />McClane Canyon Mining, LLC (CAM) in Garfield County, provided 280,000 tons of <br />coal per year to the Cameo Power Plant located in Mesa County." <br />2. Addendum #2 (page 2) to the BA (CAM -Colorado, LLC, McClane Canyon Mine <br />Expansion Project and Fruita Loadout Facility) incorrectly states "The three sediment <br />PR -02 10/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.