My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-03_PERMIT FILE - C1980004 (22)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980004
>
2017-02-03_PERMIT FILE - C1980004 (22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2017 8:44:19 AM
Creation date
7/13/2017 8:40:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Permit File
Doc Date
2/3/2017
Section_Exhibit Name
Appendix P Water Depletion Estimates
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX P <br />McOane Canyon Mine Expansion and Fruita Loadout Facility Biological Assessment <br />• Implementation. of the Fugitive Coal Dust Emission Control Plan -proposed for the <br />Loadout Facility will reduce the possibility of coal dust contaminants' affecting <br />Colorado pikeminnows in Reed Wash and downstream in the Colorado River. <br />• Construction .of -a deck beneath the rails on the proposed bridge across Reed Wash <br />and the 100 -year floodplain will minimize the possibility of hazardous -materials from <br />trains, from coal, and from creosote from affecting Colorado pikeminnows in Reed <br />Wash and downstream in the Coloeado River. <br />• Pile driving will not occur within the water. column. Although fish may hear noise <br />from driving piles, sound levels would- not result in injury because the shock wave <br />energy would dissipate through sediments. <br />• Standard stormwater and spill containment Best Management Practices for water <br />quality will avoid increased sedimentation or contaminant loading in East -Salt Creek, <br />Reed Wash, and the Colorado River. <br />• Potentially toxic herbicides will not be applied to control tamarisk or other invasive <br />species within the 100 -year floodplain of the Colorado River and riparian zone of <br />East Salt Creek. <br />The Project is likely to adversely affect Colorado pikeminnows because: <br />• Water withdrawal from the Colorado River and/or from aquifers connected to the <br />river by'the Proposed Action Would adversely affect Colorado pikeminnows. <br />Hoinreyer,'the amount of water depleted annually by the Proposed Action is less than <br />100 acre=feet and a contribution to the species' recovery would be waived. <br />Critical Habitat Effects. The Project may affect Colorado pikeminnow designated critical <br />habitat because: ' <br />• Designated critical habitat for. Colorado pikeminnow is present within the Action Area <br />and the project would physically alter 0.124 acre of critical habitat within the.100-year <br />floodplain in Reed Wash. <br />The Project is. not likely to adversely affect Colorado pikeminnow critical habitat because: <br />• There are approximately 40.53 acres of critical habitat that have been mapped by <br />FEMA within the 100 -year floodplains of Reed Wash and Loma Drain, combined. <br />The project would physically alter 0.124 acre (railroad bed and rip -rap) within the <br />100 -year floodplain in Reed Wash, about 0.3 percent of the mapped total, which is <br />insignificant. <br />• Construction of the railroad bridge across critical habitat will not cause'avulsion of <br />the 100 -year floodplain or inundation beyond Reed Wash'. ' The railroad bpdge <br />surface would not be flooded by the 100 -year flood event. <br />• The bridge has been designed so that all support pilings will be outside of the Reed <br />Wash OHWM, minimizing effects to water and'physical PCEs: <br />• Effects to the water quality PCE in Reed Wash will 'be minimized by measures <br />described above for the. Loadout Facility: lining sediment ponds to prevent seepage <br />of water and, dissolved constituents into Reed Wash and mobilization of <br />contaminants in pond substrates, removal of water from sediment ponds and <br />disposal at a commercial facility rather than pumping and discharge into Reed Wash, <br />minimizing toxic compounds from entering Reed Vlfash through -the railroad bridge_, <br />control `of fugitive coal dust, and restricting water discharge with selenium <br />concentrations greater than the numeric standards for the waterbody. <br />28 <br />PR -02 10/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.