My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-11_REVISION - M2015017
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2015017
>
2017-07-11_REVISION - M2015017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:54:17 PM
Creation date
7/12/2017 10:01:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015017
IBM Index Class Name
REVISION
Doc Date
7/11/2017
Doc Name
Adequacy Review Response #2
From
Greg Lewicki & Assoc.
To
DRMS
Type & Sequence
TR1
Email Name
MAC
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-4- <br /> 15. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed chanee(s): <br /> Adding 2 acres to the south side of the existing pit. V <br /> Maps&Exhibits: <br /> Submit two(2)complete,unbound copies of the following application exhibits: <br /> 6.3.1 EXHIBIT A-Legal Description and Location Map <br /> 6.3.2 EXHIBIT B-Site Description <br /> 6.3.3 EXHIBIT C-Mining Plan <br /> 6.3.4 EXHIBIT D-Reclamation Plan <br /> 6.3.5 EXHIBIT E-Maps,to include the location of any recorded easements <br /> 6.3.6 EXHIBIT F-List of Other Permits and Licenses Required <br /> 6.3.7 EXHIBIT G-Source of Legal Right-to-Enter <br /> 6.3.8 EXHIBIT H -Municipalities Within a Two-mile Radius <br /> 6.3.9 EXHIBIT I - Proof of Filing with County Clerk <br /> 6.3.10 EXHIBIT J-Proof of Mailing Notices of Permit Application <br /> 6.3.12 EXHIBIT L- Permanent Man-Made Structures <br /> 1.6.2(1)(b) ADDENDUM 1 -Notice Requirements(sample enclosed) <br /> 6.5 Geotechnical Stability Exhibit(as required) <br /> Responsibilities as a Permittee: <br /> Upon application approval and permit issuance,this application becomes a legally binding document. Therefore,there are a <br /> number of important requirements which you,as a pern-dace,should fully understand. These requirements are listed below. <br /> Please read and initial each requirement,in the space provided,to acknowledge that you understand your obligations. If you <br /> do not understand these obligations then please contact this Office for a full explanation. <br /> 1. Your obligation to reclaim the site is not limited to the amount of the financial warranty. You assume legal <br /> liability for all reasonable expenses which the Board or the Office may incur to reclaim the affected lands <br /> associated with your mining operation in the event your permit is revoked and financial warranty is forfeited; <br /> 2. The Board may suspend or revoke this permit, or assess a civil penalty,upon a finding that the permittee <br /> violated the terms or conditions of this permit, the Act, the Mineral Rules and Regulations,or that information <br /> contained in the application or your permit misrepresent important material facts; <br /> 3. If your raining and reclamation operations affect areas beyond the boundaries of an approved permit <br /> boundary, substantial civil penalties, to you as permittee can result; <br /> 'M?D 4. Any modification to the approved mining and reclamation plan from those described in your approved <br /> application requires you to submit a permit modification and obtain approval from the Board or Office; <br /> 5. It is your responsibility to notify the Office of any changes in your address or phone number; <br />
The URL can be used to link to this page
Your browser does not support the video tag.