My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-11_REPORT - C1981010
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981010
>
2017-07-11_REPORT - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2017 7:43:47 AM
Creation date
7/12/2017 7:08:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Report
Doc Date
7/11/2017
Doc Name
Quarterly Fill Inspection Report
From
Trapper Mining Inc
To
DRMS
Annual Report Year
2017
Report Quarter_Month
2
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
RAR
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 5, 2017 <br />2.0 Critical Construction Periods <br />2.1 Removal of All Organic Material and Topsoil <br />Topsoil and organic material removal activities were not conducted during the quarter. <br />2.2 Placement of Underdrainage Systems <br />The underdrainage system was completed in the first quarter of 2010; additional work on this <br />system is not anticipated. During the time of the inspection, the water flow was less than 0.25 <br />gallons per minute (Photograph 4). <br />2.3 Installation of Surface Drainage Systems <br />Both the north and south surface drains were inspected (Photographs 5 and 6). At the time of <br />the inspection there was no water flow. <br />2.4 Placement and Compaction of Fill Materials <br />There was no placement of material or contour work done on the fill this quarter. All of the required <br />material for the fill has been placed and compacted. It's anticipated there will be no more <br />additional fill material placed on the fill. <br />Photograph 7 depicts the west facing slope of the fill in the area where the slope of the fill is at <br />3H: 1V. <br />Photograph 4: Water from the Underdrainage System (6/28/2017) <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.