Laserfiche WebLink
July 5, 2017 <br />Horse Gulch Fill Quarterly Inspection Report <br />Second Quarter 2017 <br />Table of Contents <br />1.0 Introduction 2 <br />2.0 Critical Construction Periods 4 <br />2.1 <br />Removal of All Organic Material and Topsoil 4 <br />2.2 <br />Placement of Underdrainage Systems 4 <br />2.3 <br />Installation of Surface Drainage Systems 4 <br />2.4 <br />Placement and Compaction of Fill Materials 4 <br />2.5 <br />Revegetation 6 <br />3.0 References <br />I certify that this report was prepared by me. <br />6 <br />oO�PQO n��u,Fo <br />���� •••••: /L viii <br />• O , <br />v z <br />Z• <br />43864 �• <br />7 :A 0. <br />Tonia Marie Perkins %,'�F•••.•..•,,.•' ����� <br />CO PE 43864 ''%`N'A�l�`°�� <br />Mining Engineer <br />Trapper Mining, Inc. <br />1 <br />