My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-10_REPORT - M2001033
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2001033
>
2017-07-10_REPORT - M2001033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2020 7:34:34 PM
Creation date
7/11/2017 11:15:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001033
IBM Index Class Name
REPORT
Doc Date
7/10/2017
Doc Name
Annual Fee/Report/Map
From
Rough Cut, LLC
To
DRMS
Annual Report Year
2016
Email Name
AME
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. Total acres in various stages of reclamation,since permitted mining activities began: Page 4 of 5 <br /> Total acres Total acres Total acres ! Total acres <br /> backfilled: z r� seeded w/ ; w/topsoil mulched-%%4 >� <br /> approved mix: _ ..replaced: u approved mulch: t <br /> Total acres Total acres Topsoil 7 Mulch application <br /> graded: - ; fertilized w/ replacement rate(tons/ac): G, <br /> apvd fertilizer: depth(in.): <br /> Seed Fertilizer Mulch <br /> application j ;?, ' /�cti^,',7 application application 0 f <br /> method: method: method: ' <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NO ((N%A <br /> If"YES", indicate the weed species, control area, control type, application rate and treatment date on the reporap. <br /> 14. Is adequate topsoil reserved for reclamation, based on your approved permit? ( YES) NO N/A <br /> If`NO",please explain: <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.19(1)? { YES,` NO N/A <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office oft State <br /> Engineer(Well Permit, S.W.S.P.,and/or Permanent Augmentation Plan)? YES NO N/A <br /> 17. Are all hazardous materials stored within approved spill containment structures? YES NO N/A <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation? YES ) NO N/A <br /> 19. Is your basis for legal right to enter still valid? k_YES', NO <br /> 20. Does your permit require you to submit monitoring information annually? YES NO I,--_ <br /> A <br /> If"Yes"'. please attach the required monitoring results to this Annual Report. <br /> 2I. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials(C.R.S.34 32-116 or 34-32.5-116),attach a map to this report that accurately depicts the permit <br /> boundary,current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br /> MAP ATTACHED: <br />
The URL can be used to link to this page
Your browser does not support the video tag.