Laserfiche WebLink
PLAN VIEW <br /> E3147000 E3148000 E3149000 E3150000 E3151000 E3152000 <br /> 200 0 200 400 <br /> Scale (ft) <br /> o } <br /> 0 1"=200' <br /> o <br /> 00 ° <br /> Contour Interval =2' <br /> z <br /> Map Grid StatePlane Zone 0503 NAD83 <br /> i Surface contours—August 2010 <br /> --- ICI <br /> o <br /> o i <br /> a <br /> a <br /> _ O <br /> a <br /> o A <br /> �t <br /> yFaaa!y..O <br /> -- - <br /> -� <br /> i <br /> REVISIONS <br /> Legend Key- Sedimentation Control Structures REV DESCRIPTION BY DATE <br /> Permit Boundary — 5------ Ditch (with direction of flow) 1 Revise sediment control plan SM 12/12/86 <br /> 2 Same as above SM 01/28/87 <br /> Surface Disturbance Boundary C12 Culvert 3 Containment#2, berm, C 26& C27, D27, D28&D29 DMS 02/05/87 <br /> Type E Ditches <br /> C34** 4 D30 labeled, D27 continued SM 04/04/88 <br /> Culvert installed as needed <br /> Ditch D31 -Trapezoid Cross Section Notes Berm5 Added truck parking area, expanded noncoal waste area DMS 05/24/88 <br /> removed laydown area <br /> 0.3'Freeboard Culvert data shown on table 21, page 2.05-26, 27, and 28 of Mine LLLLLLLLLLLLL 6 Revise permit boundary in Warehouse 1 area, reroute SM 05/31/88 NOT FOR CONSTRUCTION <br /> LLLLLLLLLLLLL Small Area Exemption <br /> Permit Text. LLLLLLLLLLLL D27 & D30, remove C22 &C26, move C27 west 700', <br /> add D31 with cross sections, move Containment Area <br /> \ \ \ -- ----------------------------� T\ \ ; A Existing Well 1.l <br /> \\�\ / Ditch design data shown in Exhibit 19. 9 No. 2 and remove berm <br /> \ \ 7 Extend permit boundary around C27 DMS 08/04/88 nl�j 3.3' ' ry page 9 9 G _ 1� Information presented on this map has been reviewed by me <br /> Ditch summary on a e 2.05-23 through 26. 0 Discharge Location 8 Added ditch around powder&caphouse. Added small DF 09120/91 <br /> v of REC(q/�gTlpry and is accurate to the best of my knowledge and information. <br /> 3 _ _ 3 TR-65 West Portal Waste Disposal Area Approved but not Proposed Sparge Point area exemptions around powder&cap house, core- h'ININ�gNp <br /> Implemented at this Time. house, containment areas 1 & 2. Removed water tanks ETY <br /> &WPFan <br /> 12.0' C-52 is designed to be 36", but is currently functional at 24". ® V. E. S. Point Added D29 a& b, revised S.A.Es revised disturbance RN-6 <br /> roved 511112017 <br /> Scale: 1"=4' <br /> 9 boundary., Removed C&W RR track within disturbed DF 01/25/92 App <br /> boundary <br /> 10 Added C45, revised permit boundary and truck parking RCS 02/27/93 <br /> areas y T <br /> 11 Added revised Surface Disturbance Boundary RCS 07/20/93 <br /> 12 Removed parking area RCS 10/09/93 <br /> 13 Added C49, C52, C53, C54, D34a, D34b, D34aa, D34bb, RCS 12/02/93 Date PE# Signature <br /> Ditch D31 -Arizona Crossing C51 and berm along D34bb m <br /> 14 Added extension to C24 and removed C49 JHK 06/06/00 no <br /> 100.0' 15 Added subsidence fence JHK 08/07/00 r <br /> Iq <br /> I'3' 16 Remove Phase 1 Facilities, add ventilation fan & portal RGT 02/26/09 <br /> New Elk Mine Site Plan <br /> 17 Add culvert to D30 RGT 06/17/09 <br /> 18 TR-62 Add road to slurry wells, added C53, imoved C52 JES 03/12/12 West Portal ° <br /> Scale: 1"=20' Converted paper map to digital map <br /> 19 TR-68 UPDATE FACILITIES FOR MID-TERM PERMIT REVIEW RGT 07/31/13 Sediment and Surface Water Control Plan m <br /> 20 RN-6 Up-date Labeling RGT/LH 06/21/16 <br /> m <br /> DESIGNED BY: * DATE: 06/21/2016 m <br /> DRAWN BY: NM/RGT SCALE: AS SHOWN w <br /> 3 <br /> w <br /> z <br /> PREPARED PERMIT MAP RN-6 a <br /> FOR: Map 14 <br /> Now j6ll� C'o& Comply _44Ciz <br />