My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-11_PERMIT FILE - C1981012 (18)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2017-05-11_PERMIT FILE - C1981012 (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2017 9:38:02 AM
Creation date
7/11/2017 9:34:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Permit File
Doc Date
5/11/2017
Section_Exhibit Name
Exhibit 22 NPDES Permit
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In TRIM <br />COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT, Water Quality Control Division <br />Fact Sheet- Page 5, Permit No. C00000906 <br />thickener tank are needed; the wastewater will then be returned to the preparation plant for reuse. The Division <br />of Reclamation, Mining and Safety has jurisdiction for this activity. <br />Outfall 007 - Stormwater runoff from raw coal stockpiles, coal preparation plant area, internal haul roads, <br />equipment laydown area, top soil, and development waste piles, is routed to pond 007 where treatment is <br />accomplished using gravity separation. Wastewater from pond 007 is discharged to the Middle Fork Purgatoire <br />River via outfall 007. <br />Outfall 008 - Stormwater runoff from coal preparation plant refuse pile on the north side of Highway 12, where <br />wastewater treatment is accomplished using gravity separation. Wastewater from pond 008 is discharged to the <br />Middle Fork Purgatoire River via outfall 008. <br />Outfall 010 - Stormwater runoff from the east SAE area is directed through a diversion ditch, commingles with the <br />discharge from outfall 007, and is discharged to the Middle Fork Purgatoire River. This is a new outfall designation <br />in the permit for an existing discharge. <br />Outfall 011 - Stormwater runoff from the north topsoil SAE area is directed through a diversion ditch, and <br />discharged to the Middle Fork Purgatoire River. This is a new outfall designation in the permit for an existing <br />discharge. <br />Outfall 012 - Stormwater runoff from the west SAE area (Phase I bond released) is discharged to the Middle Fork <br />Purgatoire River. This is a new outfall designation in the permit for an existing discharge. <br />VI. PERFORMANCE HISTORY <br />A. Monitoring Data <br />1. Discharge Monitoring Reports - The following tables summarize the effluent data reported on the Discharge <br />Monitoring Reports (DMRs) for the previous permit term, from March 2009 through March 2014. Note that no <br />discharge was reported during the previous permit term for outfalls 001 A, 004 and 008. <br />
The URL can be used to link to this page
Your browser does not support the video tag.