Laserfiche WebLink
PART I <br />Page 20 of 52 <br />Permit No.: C00000906 <br />F. SPECIAL STUDIES AND ADDITIONAL MONITORING <br />1. Mixing Zone Analyses for Outfall 001 <br />Conduct remaining threshold tests for exclusion from further analysis under Mixing Zone Regulations. The second <br />threshold test is the Application of the Mixing Zone Exclusion Tables (p. 20, Colorado Mixing Zone Implementation <br />Guidance, February 2002). Under this compliance action, the permittee will collect the necessary site-specific <br />data, perform the required analysis, and provide a report to the Division. The report will indicate the findings of <br />this threshold test and, if not excluded, provide the workplan for the next threshold test (i.e., determining of the <br />size of the physical and regulatory mixing zones). <br />Code Event Description Due Date <br />50008 Submit Study Collect site-specific data, perform threshold tests based on 03/31/2018 <br />Results Mixing Zone Exclusion Tables, and submit study results. <br />2. Temperature Monitoring Equipment for Outfall 001 <br />The facility is required to install continuous temperature monitoring equipment by December 31, 2015 (6 <br />months) to comply with the temperature monitoring 'continuous' requirements listed in EFFLUENT LIMITATIONS <br />AND MONITORING REQUIREMENTS. <br />G. CONTROL MEASURES (Outfalls 004, 007,008, 010, 011 and 012) <br />All control measures used by the permittee to meet the effluent limitations contained in this permit must be selected, <br />designed, installed, implemented, and maintained in accordance with good engineering hydrologic and pollution <br />control, and the manufacturer's specifications, when applicable. <br />1. Installation and implementation specifications <br />Installation and implementation specifications for each control measure type used by the permittee to meet the <br />effluent limitations contained in this permit must be retained with the SWMP (see STORMWATER MANAGEMENT <br />PLAN section). <br />2. Maintenance of Control Measures and Associated Documentation <br />a. The permittee must maintain all control measures used to achieve the effluent limits required by this <br />permit in effective operating condition. For this permit, maintenance includes preventative and routine <br />maintenance, modification, repair, replacement, or installation of new control measures. Observations <br />resulting in maintenance activities can be made during a site inspection, or during general observations of <br />site conditions. <br />b. Corrective actions associated with maintaining control measures must be conducted with due diligence, as <br />soon as possible after the need is discovered, to achieve the effluent limits required by this permit. The <br />permittee must implement interim control measures to achieve the effluent limits required by this permit <br />while performing maintenance of the primary control measure. <br />c. The permittee shall document corrective actions associated with maintaining control measures, in <br />accordance with the CORRECTIVE ACTIONS section of this permit, and shall revise the facility SWMP to <br />reflect replacement or installation of new control measures in accordance with the STORMWATER <br />MANAGEMENT PLAN section requirements. <br />H. INSPECTIONS (Outfalls 004, 007, 008, 010, 011 and 012) <br />1. Inspection Frequency and Personnel <br />The permittee shall conduct and document field inspections of all drainage areas contributing runoff to the outfalls <br />referred to in this Part, as follows: <br />