My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-11_PERMIT FILE - C1981012 (17)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2017-05-11_PERMIT FILE - C1981012 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2017 9:33:07 AM
Creation date
7/11/2017 9:31:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Permit File
Doc Date
5/11/2017
Section_Exhibit Name
Exhibit 19 Sediment Design Specifications
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 19 <br />SEDIMENT DESIGN SPECIFICATIONS <br />VOLUME 2 <br />1) Allen Mine Hydrologic Balance of Surface Runoff <br />2) Thickener Discharge Plan, 5/31/85 and 3/17/87 <br />3) Results of Annual Pond Survey -Ponds 006 and 007, 11/10/87 <br />4) Refuse Area Road Design, 9/93 <br />5) Miscellaneous Drainage Supplement <br />i. West Portal Containment Areas 1 and 2, no date <br />ii. West Portal Culvert Data C21 through C-25, 3/19/97 <br />iii. MR -40 Culverts 43 and 44,1/18/92 <br />iv. TR -23 SAE Demonstrations for Seven Sites <br />1. West Portal Substation, 0/26/91 <br />2. West Portal Water Tanks, Area 1, 9/26/91 <br />3. West Portal Water Tanks, Area 2, 9/26/91 <br />4. West Portal Core House, 9/18/91 <br />S. East Portal Water Tanks, 5/20/91 <br />v. MR -43 Ditch D-17 and D-33 Included, 3/27/1992 <br />vi. TR -25 Containment Area 1, 6/11/92 <br />1. East of Refuse Belt, 6/20/91 <br />2. West of Refuse Overflow, 6/20/92 <br />3. Containment Area 2, 6/11/92 <br />4. West of Refuse Belt, 6/20/92 <br />vii. TR -30 New Elk Pumphouse, West Portal Area SAE, 10/14/93 <br />1. Culvert 49 West of New Elk Hoist House 10/14/93 <br />2. D -23A, North Road Ditch, North of Hoist House 10/15/93 <br />3. D-2313, North Road Ditch South of Hoist House 10/15/13 <br />4. SAE for Contaminated Topsoil 10/15/93 <br />viii. TR -31 Ditch 24 &24A, Culverts C34, C35, C36, C46, C47, 12/3/93 <br />1. Culvert C-48 on Ditch D26,12/3/93 <br />ix. TR -33 D18 from Head to 960' West 10/8/93 <br />x. SAE Demo, Topsoil Pile 2, NW of Plant 11/29/93 <br />xi. TR -35 East Side of Dev Coal Waste Pile SAE 7/6/94 <br />xii. TR -38 Refuse Area Ditch D35C and Culvert C58 3/7/95 <br />1. Refuse Area Ditch D-36 3/7/95 <br />2. Refuse Area Ditch D -35A 3/7/95 <br />3. Refuse Area Ditch D -365B 3/7/95 <br />4. Refuse Area Culvert C57 3/23/95 <br />6) Ditch 17B and Culvert C5012/2/93 <br />RN -6 Page i Revised 2016-01-24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.