on Map 22 Mine Progress Map. Surface facilities associated with the underground <br />mining are shown on Maps 11, Sheets 1-3 and Map 12. Future mining is subject to <br />conditions encountered. <br />Mining is currently planned for 2011 -2015 within the area bounded by the permit <br />boundary as shown on Map 3-2011 Mine Plan. Mining for 2011-2015 is anticipated <br />to occur in the Allen seam north of the Purgatoire River and East to the permit <br />boundary. Mining is planned in the Apache seam south and east of the East Portals. <br />Mining in the Allen and Apache Seams will not overlap except where the Apache <br />Seam must cross over old Allen seam workings. Blue Seam mining will proceed east <br />to the permit boundary and then turn south. Continued development and operations <br />of the New Elk Mine within the lease area will require additional permit revisions to <br />complete full recovery of the coal reserve. Minor additional surface disturbance may <br />be associated with the continued operation of the mine. This surface disturbance, if <br />required, will provide for ventilation and escape ways as development progresses <br />away from the main portal area to maintain continued production and safe working <br />conditions. The total affected area based on the TR -58 mine plan and historic mining <br />is 3,799.5 acres. The permit boundary totals 4,199.5 acres. Long-term mine plans are <br />shown on Figure 2. Life of mine acreage as shown on Figure 2 totals approximately <br />19,050 acres. Future revisions to the permit may propose mining in the Maxwell <br />seam. <br />2.05.3 Operation Plan -Permit Area <br />The planned underground workings are show on Map 3-2011 Mine Plan. The <br />generalized stratigraphy of the Allen, Apache and Blue Seams are shown on Figure <br />1. The mine was temporarily closed and sealed in 1989. Dewatering ceased and the <br />lower areas of the mine were gradually flooded. <br />Phase 1 of resuming operations required remotely pumping mine water from the East <br />Portal airshaft and other boreholes using surface -powered pumps. Approvals for this <br />process were granted in 2008 and dewatering started in December of 2008. Phase Il <br />re-establishes mine ventilation by breaching temporary seals at the East and West <br />Portals and Apache Canyon, and reinstallation of fans at the East Portal and West <br />Portal airshafts. Phase III is the development of entries to establish ventilation at the <br />Apache Seam level. Phase IV is the active mining of coal. <br />The planned development of mains and panels will occur as shown on Map 3 2011 <br />Mine Plan. Development of main access entries north and south of the portals will <br />begin upon completion of the connection to the East Portal airshaft. Mining in the <br />Allen Seam will advance north and east of the slopes. Mains will be developed north <br />off the slope bottom ramping down to the Allen Seam after crossing over old Allen <br />works. The mains will be extended through the Allen Seam to the east and north. <br />Panels will be driven off the mains, one panel to the east and four panels to the west. <br />The Allen Seam mining is development only. No pillar recovery is planned in the <br />Allen seam works. <br />Section 2.05 RN -6 10/17/2016 <br />