Laserfiche WebLink
rol <br />Figure 14- Cut Slope Detail with Map 15 References Showing Disturbance <br />Figure 14a- Bates Portal Slope and Reclamation Area Detail with Map 15 References Showing <br />Disturbance <br />Figure 15- Typical Lower Permanent Seal at East Portal <br />Figure 15a- Piping for Recycling of Slurry <br />Figure 16- Typical Airshaft Seal <br />Figure 16a- Typical Borehole Seal <br />Figure 17- Raptor Proof Powerpole Design <br />Figure 17a- Raptor Proof Pole West Portal Power Line <br />Figure 18- Electrical Conductivity as a Function of Effluent Volume <br />Figure 19- Subsidence Related Features <br />Figure 20 - Table 26A Comparison of New Elk Slurry Water Quality with Water Quality Standards <br />Figure 21- Table 26B Projections of the Flooded Workings Water Quality following Recycling <br />Figure 22- Table 26C Impacts to the Purgatoire River from discharge from the Flooded Workings <br />Figure 23- Culvert Sizing Nomograph <br />Section 2.05 Part 2 TR -68 6/10/2013 <br />