Laserfiche WebLink
Water Tank <br />Solenoid Valve Gland Water Line (25 GPM) <br />Make -up Water Line j Refuse (120 TPH, 25% Moisture, 119.9 GPM) <br />Raw Coal (400 TPH, 5 °0 <br />Moisture, 79.9 GPM) <br />Clean Coal (280 TPH, 5% Moisture, 55.9 GPM) <br />Emergency Sewage <br />Plant Discharge <br />Make -up <br />Water Line <br />—Pump— <br />_ - -- ►Discharge to <br />Pond 006A ;;7— Purgatoire River <br />Thickener _ <br />Discharge <br />Note: At 400 tons per hour feed to the plant, 70.9 gpm of make -up water is needed. <br />o u <br />INew Elk Mine Permit Map <br />REVI BY I DATE WYOMING FML COMPANY <br />NEW ELK PREP PLANT <br />Las Animas County,Colorad <br />WATER FLOW SHEET <br />PREPARED BY: SMagnuson <br />DWN BY :SADavis Figure 4 <br />OATE�12 /1fi /8G <br />