My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-06-28_PERMIT FILE - C1981025A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981025
>
2017-06-28_PERMIT FILE - C1981025A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 10:13:07 AM
Creation date
7/11/2017 7:20:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025A
IBM Index Class Name
Permit File
Doc Date
6/28/2017
Section_Exhibit Name
4.0 Operation and Reclamation Status
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The clear water storage pond receives water from Sedimentation Pond <br />Number 2. After the sedimentation process, water is stored here for <br />re -use in the washdown process. <br />All of the ponds and diversions will be reclaimed at the end of <br />operations. <br />4.3.2.5 Topsoil Removal, Handling and Storage <br />Topsoil in the loadout area, including areas for the rail spur, dri- <br />veway, ponds, surge bin, haul road, and conveyor, was removed and <br />stockpiled in protected areas away from possible sources of con- <br />tamination. <br />Because of the nature of the disturbance, involving almost exclusively <br />roadbed construction and ponds with no area -wide excavations or deep <br />• disturbances, only a "functional" surface layer was salvaged and the <br />subsoil was left in place. The affected soils are relatively homoge- <br />neous. <br />• <br />In general, the rail spur and associated areas occur on soil with an <br />8 -to 12 -inch surface layer which was taken up and stockpiled. The <br />portion of the haul road which occurs on prime farmland also yielded 8 <br />to 12 inches of topsoil. These areas are considered collectively <br />here, but a more detailed discussion of the prime farmland con- <br />siderations is given in Section 5.1 of this application. Because of <br />the steep slope and relatively barren condition of the truck dump <br />site, topsoil development has not occurred to any salvageable extent. <br />Vegetation was not removed before stockpiling topsoil since the cover <br />consists of pasture grasses and alfalfa. No overburden, waste <br />4-39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.