My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-10_REPORT - C1981019
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981019
>
2017-07-10_REPORT - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2017 10:14:07 AM
Creation date
7/11/2017 7:17:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
7/10/2017
Doc Name
Quarterly Fill Inspection Report
From
Tri-State Generation and Transmission Association, Inc
To
DREMS
Annual Report Year
2017
Report Quarter_Month
2
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
ZTT
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
South Tavlor Fill Inspection Certification <br />On June 27th, 2017 1 inspected the South Taylor Fill areas, which includes the East Taylor Fill <br />and the West Taylor Fill, identified on Map 23A and Map 45 of the approved permit. The <br />purpose of this inspection was to observe the status of the fill placement. This inspection is <br />necessary to satisfy the requirements of CDRMS Rule 4.09.1(1)(c) and Rule 4.09.1(11). <br />Weather conditions at the time of inspection were approximately 90°F and sunny. <br />West Taylor Fill with A -A' and B -B' Underdrain Area No new activity has occurred within the <br />permanent West Taylor Fill since last inspection. The East Tributary of the West Taylor fill has <br />been rip -rapped up to the 7850' elevation (approximately). The West Tributary of the West <br />Taylor fill has been rip -rapped up to the 7820' elevation. Dumping has resumed on the 8100' <br />level of the temporary out of pit stockpile. <br />The current water level reading of the piezometer well was 223.2 feet from the ground surface, <br />a decrease of 21.8 feet from the previous quarter. The West Taylor Fill underdrain was freely <br />flowing at the time of inspection. <br />No structural weakness, signs of instability, or other hazards were noted at the time of <br />inspection. <br />East Taylor Fill with C -C' Underdrain Area: No activity other than rock crusher operations <br />have taken place within the East Taylor fill during this quarter. <br />Design requirements for the spoil pile are addressed in Volume 13, Exhibit 21, Item 1, <br />Introductory Letter. Inspection requirements during construction are further detailed in Volume <br />12, Section 4.09. <br />No structural weakness, signs of instability, or other hazards were noted at the time of <br />inspection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.