My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-10_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2017-07-10_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2017 1:41:38 PM
Creation date
7/11/2017 7:07:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
7/10/2017
Doc Name
Adequacy Review Response #3
From
DRMS
To
Colowyo Coal Company LP
Type & Sequence
MR174
Email Name
ZTT
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task 0 002 Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Re rade To soil for Collorn In -Pit Drill Pads <br />Site: Colowyo Coal Mine Permit Action: MR174 Permit/Job##: C1981019 <br />PROJECT IDENTIFICATIOI\ <br />Task ##: 002 <br />Date: 6119/2017 <br />User: ZTT <br />State: Colorado <br />County: Moffat <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat Dl lT- 11U <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />1 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />100 <br />Abbreviation: None <br />Filename: C019-002 <br />Total unit Cost/Hour: $484.97 <br />Total Fleet Cost/Hour: $484.97 <br />MATERIAL QUANTITIES <br />Initial Volume: 13,552 <br />Swell factor: 1.000 <br />Loose volume: 13,552 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly production: 2,870.3 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />_7,600 feet_ <br />1,600 lbs/LCY <br />Weight description: Top Soil <br />Job Condition Convection Factor <br />Source <br />Utilizati2n.Y2 <br />Ownership Cost/Hour: <br />$226.13 <br />NA <br />Operating Cost/Hour: <br />$183.90 <br />100 <br />Ripper own. Cost/Hour: <br />$21.79 <br />NA <br />Ripper op. Cost/Hour: <br />$11.30 <br />100 <br />Operator Cost/Hour: <br />$41.85 <br />NA <br />Total unit Cost/Hour: $484.97 <br />Total Fleet Cost/Hour: $484.97 <br />MATERIAL QUANTITIES <br />Initial Volume: 13,552 <br />Swell factor: 1.000 <br />Loose volume: 13,552 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly production: 2,870.3 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />_7,600 feet_ <br />1,600 lbs/LCY <br />Weight description: Top Soil <br />Job Condition Convection Factor <br />Source <br />Operator Skill: 0.900 <br />AB.AVG. <br />Material consistency: 1.000 <br />{CAT HB <br />Dozing method: I.000 <br />GENS <br />Visibility: 1.000 <br />(AVG.} <br />
The URL can be used to link to this page
Your browser does not support the video tag.