Laserfiche WebLink
EAST DRYING AREA <br />RESERVED FOR <br />COMPACTION <br />A <br />�jJf t� <br />GOB PILE FOOT PRINT Ja'T <br />SHOWS ORIENTATION OF STACKED GOB <br />WEST DRYING AREA / <br />'1E{FL <br />EAST GOB DR crc ,I r <br />ACTIVE GOB PL MEN <br />ND COMPACTION RE <br />B.2 <br />ol <br />r <br />DA REA 80 DARY <br />J j <br />AREA / SECTION A -A <br />WINTER GOB STACKING PLAN <br />NO PILE OVERLAP <br />SPACE BETWEEN ROWS TO BE GRADED <br />TO ACHIEVE POSITIVE DRAINAGE. MAINTAIN <br />FLOW PATH AS NECESSARY. <br />N PROJECT: BOWIE RESOURCES, LLC <br />W E TITLE: GOB PILE #3 DRYING/PLACEMENT LOCATION <br />oNsNCH OPERATIONAL SEDIMENTATION CONTROL PLAN <br />DESIGNED BY: J.E.S. 02/27/14 DMG I.D. No. DWG. NAME: <br />C - 1996 - 083 <br />REVISED BY: T.K.B. 09/25/15 SCALE: <br />NOT TO SCALE <br />MR -194 -VOLUME XI, 4b- 05117 <br />