Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 003 <br />BULLDOZER WORK <br />Task description: Regrade Topsoil for Collom In -Pit Drill Roads <br />Site: Colowyo Coal Mine Permit Action: MR174 <br />PROJECT IDENTIFICATION <br />Task #: 003 State: <br />Date: 6/20/2017 County: <br />User: ZTT <br />Colorado <br />Moffat <br />Agency or organization name; DBMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat DI IT - 1 IU <br />Horsepower: <br />_ <br />850 <br />- -—......_. <br />Blade Type: <br />Universal <br />Attachment: <br />1 -shank ripper <br />Shift Basis: <br />_ <br />I per day <br />Data Source: <br />�CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. Cost/Hour; <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $484.97 <br />Total Fleet Cost/Hour: $484.97 <br />Utilization % <br />$226.13 NA <br />$183.90 <br />$21.79 <br />$11.30 <br />$41.85 <br />100 <br />NA <br />100 <br />NA <br />Page 1 of 2 <br />Permit/Job#: C1981019 <br />Abbreviation: None_ <br />Filename: CO 19-003 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />5,969 <br />Swell factor: <br />1.000 <br />Loose volume: <br />5,969 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />2,870.3 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 0% <br />Average site altitude: 7,600 feet <br />Material weight: 1,6001bs/LCY <br />Weight description: Tot, Soil <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.900 <br />AB.AVG.) <br />Material consistency: <br />1.000 <br />CA_T_ HB <br />Dozing method: <br />I.060 <br />GEN. <br />Visibility: <br />1 A60 <br />AVG. <br />