My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-07_REVISION - C1981019 (10)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2017-07-07_REVISION - C1981019 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2017 8:57:32 AM
Creation date
7/10/2017 8:24:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
7/7/2017
Doc Name
Adequacy Review #2
From
DRMS
To
Colowyo Coal Company
Type & Sequence
MR174
Email Name
ZTT
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Colow o Coal Mine <br />COST SUMMARY WORK <br />Reclaim In -Pit Drill Holes and Associated Roads <br />Permit Action: MR174 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 6/1912017 County: Moffat <br />User: ZTT <br />Agency or organization name: <br />TASK LIST (DIRECT COSTS) <br />DRMS <br />Permit/Job#: C 1981019 <br />Abbreviation: None <br />Filename: 0019-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />Plug and Seal 33 Collom In -Pit Drill Holes <br />BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />194.00 <br />$30,448.97 <br />$2,292.00 <br />$1,010.00 <br />$6,720.00 <br />Re rade Topsoil for Collom In -Pit Drill Pads DOZER <br />4.73 <br />Re rade Topsoil for Collom In -Pit Drill Roads DOZER <br />2.08 <br />Reseed Collom In -Pit Drill Pads and Roads REVEGE <br />11.20 <br />SUBTOTALS: <br />212.01 <br />$40,471 <br />INDIRECT COSTS <br />161TA1Ill .1to1' Zi119its] af6 <br />Liability insurance: <br />2.02 <br />Total = <br />$817.51 <br />Performance bond: <br />1.05 <br />Total - <br />$424.95 <br />Job superintendent: <br />106.00 <br />Total = <br />$7,743.30 <br />Profit: <br />10.00 <br />Total = <br />$4,047.10 <br />TOTAL 0 & P = <br />$ I3,032.86 <br />CONTRACT AMOUNT (direct - 0 & P) _ <br />$53,503.86 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total - 0.00 <br />Engineering work and/or contract/bid preparation: <br />2.00 <br />Total = $1,070.08 <br />Reclamation management and/or administration: <br />1.91 <br />$1,021.92 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST= $15,124.86 <br />TOTAL BOND AMOUNT (direct + indirect) = $55,595.86 <br />
The URL can be used to link to this page
Your browser does not support the video tag.