My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-06-30_HYDROLOGY - M2009082
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2009082
>
2017-06-30_HYDROLOGY - M2009082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2017 1:46:37 PM
Creation date
7/6/2017 9:32:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009082
IBM Index Class Name
Hydrology
Doc Date
6/30/2017
Doc Name
Substitute Water Supply Plan
From
DNR Water Resources
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Office of the State Engineer <br />1313 Sherman Street, Room 821, Denver, CO 80203 P 303.866.3581 <br />www.water.state.co.us <br /> <br /> <br /> June 30, 2017 <br /> <br />Mr. David M. Heintz, P.E. <br />Bishop-Brogden Associates, Inc. <br />333 West Hampden Ave, Ste 1050 <br />Englewood, CO 80110 <br /> <br />Re: Martin Marietta’s Parsons Mine Substitute Water Supply Plan (WDID 0302583, Plan ID <br />5822) <br /> DRMS File No. M-2009-082 (WDID 0303045) <br /> Sections 25 and 36, T6N, R67W, 6th P.M., and Sections 30 and 31, T6N, R66W, 6th P.M. <br /> Water Division 1, Water District 3, Weld County <br /> <br />Approval Period: June 1, 2017 through May 31, 2018 <br />Contact information for Mr. Heintz: 303-806-8952; dheintz@bbawater.com <br /> <br />Dear Mr. Heintz: <br /> <br /> We have reviewed your letter dated April 26, 2017 requesting approval of a substitute water <br />supply plan (“SWSP”) on behalf of Martin Marietta (“Applicant” or “MM”) in accordance with § 37-90- <br />137(11), C.R.S., to cover depletions caused by an existing gravel pit operation known as the Parsons <br />Mine (M-2009-082). The required renewal fee of $257 has been received (receipt no. 3679492). The <br />Applicant shall be responsible for compliance with this SWSP, but the State Engineer’s Office may also <br />pursue the landowner for eventual compliance. <br />SWSP Operations <br />The Parsons Mine is located along the Cache La Poudre River in Sections 25 and 36, Township <br />6 North, Range 67 West of the 6th P.M., and Sections 30 and 31, Township 6 North, Range 66 West of <br />the 6th P.M., as shown on the attached Figure 1. Mining operations will occur in several phases and <br />are expected to last approximately 5 years. Due to restrictions related to eagle nesting habitat, <br />MM will mine different areas of the site during different times of the year. It is anticipated that <br />mining operations will occur in Phases 1A, 1B, and 1C during this plan period. No ground water has <br />been exposed in Phase 1A or 1C yet. A contemplated “first fill” of Phase 1C discussed in the <br />previous SWSP did not occur. Once ground water is exposed, all phases of the mine will be <br />continuously dewatered for the entire plan period. The depletions that are projected to result <br />from the mining operations over the period of this SWSP include evaporation from exposed ground <br />water, water removed with the mined product, and water used for dust suppression. The proposed <br />replacement sources are a combination of 12 Whitney Ditch shares owned by MM, water stored in <br />MM’s Heaton Reservoir, and/or excess reusable effluent leased from the City of Greeley. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.