My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-05_INSPECTION - M1999098
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1999098
>
2017-07-05_INSPECTION - M1999098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2020 11:27:09 AM
Creation date
7/5/2017 4:01:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999098
IBM Index Class Name
INSPECTION
Doc Date
7/5/2017
Doc Name
Corrective Action Extension Request
From
Aggregate Industries
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GM <br /> Connie Davis <connie.davis@aggregate-us.com> <br /> Re: Cell 3 repair <br /> 1 message <br /> Connie Davis <connie.davis@aggregate-us.com> Thu, Jun 29, 2017 at 10:24 AM <br /> To: Ben VomBaur<ben.vombaur@g mail.com> <br /> Thanks for your response, Ben. With regard to the Cell 3 repair, I don't think the State is going to let that go. I had <br /> actually talked to Peter Hayes about that after you initially indicated that you had done some work on your property and <br /> no longer thought it necessary or desirable for us to do the Cell 3 repair and he didn't seem to think they could back off on <br /> that because it had already been cited as an issue. In any case, I will be reaching out to him today to let him know we <br /> haven't been able to get in and do the repair so will need an extension of time from the June 30 deadline for doing so. <br /> With regard to the pumping, I noticed that the pump was not running yesterday and contacted the contractor to find out <br /> why it was not operating. He explained that, because of the work they are currently doing on the floor of the pit and <br /> pushing dirt in from the top of the pit to construct the reclamation slopes, the water gets dirty. While some of that water <br /> goes to the Ramos pond and on to you, the majority goes into our pond and discharges to the river. We cannot allow <br /> dirty water to be pumped to the river, so they turn off the pump during the day while they are working and they turn it back <br /> on at night. Hopefully this will be sufficient for now, but the contractor will evaluate the situation today and see if they can <br /> come up with a plan to pump more frequently and still keep the water clean enough to go to the river. <br /> Thanks again- Connie <br /> On Thu, Jun 29, 2017 at 9:54 AM, Ben VomBaur<ben.vombaur@gmail.com> wrote: <br /> I no longer need cell 3 repaired and I would actually prefer if it went unchanged. <br /> On another issue, the pumping into our ponds seem to have slowed or stopped. <br /> Ben VomBaur <br /> On Jun 29, 2017 11:45 AM, "Connie Davis" <connie.davis@aggregate-us.com>wrote: <br /> Hi Ben -Just wanted to check in with you and see if you are having any issues since the repairs/improvements you <br /> made on your property. Our contractors have still not yet been able to access the slope area that Division of <br /> Reclamation, Mining and Safety wanted us to repair on Cell 3 south of you. They had asked that we complete this <br /> by June 30. <br /> We still intend to do this work when access becomes available, and likely after the other slope reclamation that the <br /> contractor is currently working on along the north and east boundaries of the mining area is completed. <br /> Please let me know. <br /> Thanks- Connie <br /> On Thu, Mar 9, 2017 at 1:32 PM, Ben VomBaur<ben.vombaur@gmail.com>wrote: <br /> I emailed Peter Hays regarding the Cell 3 repair. I do not believe it is still necessary. I don't know if this email is <br /> coming too late to halt the construction/repair. Feel free to call me if you would like to discuss this. <br /> Ben VomBaur <br /> 970-590-9966 <br /> Connie N.Davis <br /> Land Manager,Land and Environment <br /> Aggregate Industries US <br /> Aggregate Industnes-WCR,Inc. <br /> P.O.Box 337231 <br /> Greeley,CO 80633 <br /> Phone: 970-396-5252 <br />
The URL can be used to link to this page
Your browser does not support the video tag.