My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-06-29_REPORT - M2011015
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2011015
>
2017-06-29_REPORT - M2011015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2017 8:55:59 AM
Creation date
7/3/2017 2:09:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011015
IBM Index Class Name
Report
Doc Date
6/29/2017
Doc Name
Annual Fee/Report/Map
From
Seifert Enterprises
To
DRMS
Annual Report Year
2017
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12.Total acres in various stages of reclamation,since permitted mining activities began: <br />Page 4 of5 <br />Total acres <br />backfilled: <br />Total acres <br />graded: <br />o <br />o <br />Total acres <br />seeded w/ <br />approved mix: <br />Total acres <br />fertilized w/ <br />apvd fertilizer: <br />O <br />0 <br />Total acres <br />w/topsoil <br />replaced:o <br />6 <br />Total acres <br />mulched w/ <br />approved mulch: <br />Mulch application <br />rate (tons/ac): <br />& <br />Seed <br />application <br />method: <br />Fertilizer <br />application <br />method: <br />Topsoil <br />replacement <br />depth (in.): <br />Mulch <br />application <br />method: <br />14.Is adequate topsoil reserved for reclamation, based on your approved permit? <br />If "NO",please explain: <br />15.Isthe reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? <br />If"NO" please explain: <br />13.Is weed control being conducted in accordance with an approved Weed Control Plan?YES NO ^*N/Aj <br />If"YES", indicatethe weedspecies,control area,controltype,application rate andtreatmentdateonthe reportmap <br />^yeT)NO N/A <br />YES )NO N/A <br />16.If mining has exposed groundwater,isthe site in compliance with the approved mining planjnoipfilce ofthe State <br />Engineer(Well Permit,S.W.S.P.,and/or Permanent Augmentation Plan)? <br />17. Areall hazardousmaterialsstored within approvedspillcontainmentstructures? <br />18.Isyour financial warranty value sufficient tocoverthecostto complete reclamation? <br />19.Is your basis for legal right to enter still valid? <br />20. Doesyour permit require youtosubmit monitoring information annually? <br />If"Yes",please attachthe required monitoring results tothis Annual Report. <br />21.As requiredby ColoradoMined Land Reclamation Act and/orColoradoLand ReclamationAct for the Extraction of <br />Construction Materials (C.R.S.34-32-116 or 34-32.5-116),attach a map to this report that accurately depicts the permit <br />boundary,current affected area boundary and location ofthe acreages specified in items 7-12 and 14.UPDATED <br />MAP ATTACHED:j^ <br />rES^NO N/A <br />YES NO (N/A) <br />(YES)NO N/A <br /><YES)NO <br />YES fid)N/A
The URL can be used to link to this page
Your browser does not support the video tag.