My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-06-30_REVISION - M1977219 (11)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977219
>
2017-06-30_REVISION - M1977219 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:40:53 PM
Creation date
7/3/2017 10:31:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977219
IBM Index Class Name
Revision
Doc Date
6/30/2017
Doc Name
Inert Fill Notice
From
Summit Brick & Tile
To
DRMS
Type & Sequence
AM3
Email Name
ERR
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LO',�& U M M I <br /> Phone. 719.542.8278 BRICK COMPANYFax: 719.542.5243 <br /> 601 East 13,1,Street RECEIVED <br /> P.O.Box 533 <br /> INERT FILLPN Ift0(k)E 3.1.5(9)) JUN 3`0 2017 <br /> Fox Pit- M-1977-219 <br /> OMSM OF RECLAMATON <br /> MANG AND SAFETY <br /> During the life of the mine Summit Brick & Tile Co. will import <br /> inert materials as defined in Rule 1 . 1 (20) , into this mining <br /> operation. Reclamation activities at this mine involve operation <br /> of an Inert Material Landfill and the imported material will be <br /> used to backfill the excavated areas or recycled and sold. If <br /> courser, fill is used for backfilling it will be covered with <br /> finer material and revegetated where required by the permit . If <br /> the material is clean dirt, we will use it to supplement the <br /> topsoil needs for the mined area. <br /> The amount of material to be imported may be up to approximately <br /> 4 , 000, 000 cubic yards . We will record the volume imported each <br /> year and keep a running total, so if needed, the Division will <br /> know how much and how it as disposed of. We will continue to <br /> import inert fill until reclamation is complete or we no longer <br /> have a source . <br /> No specific compaction rates are proposed for the fill . The <br /> material usually available contains smaller pieces of brick, <br /> concrete, or dirt mixed with the larger pieces of the same <br /> material . This makes it very difficult to achieve a specific <br /> compaction rate . While we take no action to reach a specific <br /> compaction rate, the way the material is placed tends to compact <br /> it . We run heavy equipment over the filled area during the <br /> filling process and the material is compacted as a result . <br /> Stabilization of this fill material is not a concern because of <br /> the way it is placed. What voids do remain are usually under <br /> large pieces of material and little settling is possible . The <br /> depth of the fill will not be so great as to affect offsite lands <br /> if settling occurred. <br />
The URL can be used to link to this page
Your browser does not support the video tag.