Laserfiche WebLink
WAG` R <br /> Construction, Inc. <br /> 1850 E. 1st. Street, Craig, CO 81625 <br /> Phone & Fax (970) 824-2709 <br /> Wa nerCo .coin <br /> D-9 Dozer Smooth existing gravel, 2hr $500.00 <br /> Hourly Rate grade to drain <br /> $250.00 <br /> Truck/Tractor/50T Mobilization/Demobilization .25 hours $37.25 <br /> Trailer Hourly Rate of crew and equipment <br /> $149.00 <br /> Total $537.25 <br /> Graveled Farm Equipment Storage Costs—Reference Exhibit E and Exhibit F <br /> Graveled Farm Equipment Storage —3.44 Acres <br /> Non-excavated affected areas that are currently graveled for mining operations to the <br /> southeast of the open pit will remain with existing gravel for farm equipment storage. <br /> No additional gravel will be applied in this area, as existing quantities are adequate. <br /> Estimated at approximately 3.4 acres. Existing contours are flat and free draining and <br /> will remain. <br /> After reclamation activities no buildings or mine related features will remain. No <br /> topsoil, overburden or seeding will occur in this area. Existing sediment control <br /> features controlling hydrologic balance and preventing off site damage will remain <br /> providing for a stable configuration consistent with the proposed future land use. <br /> D-9 CAT Dozer Dress existing gravel lhour $250.00 <br /> Hourly Rate <br /> $250.00 <br /> Truck/Tractor/50T Mobilization/Demobilization .25 hours $37.25 <br /> Trailer Hourly Rate of crew and equipment <br /> $149.00 <br /> Total $287.25 <br /> Zone 1 78%) $3,005.00 <br /> Zone 2 (14%) $537.25 <br /> Zone 3 8% $287.25 <br /> Total Reclamation Costs $3,829.50 <br /> Total Indirect Cost Plus (23.5) $899.93 <br /> Total $4,729.43 <br />