My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-06-30_INSPECTION - C1982056
>
Day Forward
>
Inspection
>
Coal
>
C1982056
>
2017-06-30_INSPECTION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2017 9:14:44 AM
Creation date
6/30/2017 12:58:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Date
6/30/2017
Doc Name
Inspection Report
From
DRMS
To
Twentymile Coal, LLC
Inspection Date
6/19/2017
Email Name
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 19, 2017 C-1982-056/Foidel Creek Mine TNL <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 9 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 2 of 9 <br /> <br /> <br />Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br />Y - Air Resource Protection <br />R - Availability of Records <br />R - Backfill & Grading <br />R - Excess Spoil and Dev. Waste <br />Y - Explosives <br />Y - Fish & Wildlife <br />R - Hydrologic Balance <br />R - Gen. Compliance With Mine Plan <br />N - Other <br />R - Processing Waste <br /> <br />Y - Roads <br />N - Reclamation Success <br />N - Revegetation <br />Y - Subsidence <br />R - Slides and Other Damage <br />Y - Support Facilities On-site <br />R - Signs and Markers <br />NA - Support Facilities Not On-site <br />NA - Special Categories Of Mining <br />R - Topsoil <br /> <br /> <br />COMMENTS <br /> <br />This was a complete inspection of the Foidel Creek Mine, operated by Twentymile Coal, LLC. (TC), DRMS <br />Permit No. C-1982-056. The inspection was an OSM Oversight of a complete inspection. Tabetha Lynch and <br />Dan Hernandez with the Colorado Division of Reclamation, Mining and Safety (Division) conducted the ground <br />inspection between 6/19/2017 and 6/22/2017. Dan Mackinnon with the Office of Surface Mining, was present for <br />the entire inspectionh. Either Jerry Nettelton or Miranda Blomquist with TC accompanied the the inspection. The <br />weather was mostly clear and hot. All areas of the mine were accessible. Maintenance items are bulleted below. <br />AVAILABILITY OF RECORDS – Rule 5.02.4(1): <br /> Records were checked at the mine office. Details are provided at the end of this report. Subsidence <br />monitoring was being conducted at the mine and recent data was available for review. <br /> <br />BACKFILL and GRADING – Rule 4.14 <br />Contemporaneous Reclamation 4.14.1; Approximate Original Contour 4.14.2; Highwall Elimination 4.14.1(2)(f); <br />Steep Slopes 4.14.2, 4.27; Handling of Acid and Toxic Materials 4.14.3; Stabilization of Rills and Gullies 4.14.6: <br /> The 10 R pipeline area was backfilled and graded and seeded in late Fall of 2016. The area appears stable <br />and vegetation is starting to grow. <br /> <br />EXCESS SPOIL and DEVELOPMENT WASTE – Rule 4.09 <br />Placement; Drainage Control; Surface Stabilization: <br /> Comment <br /> <br />HYDROLOGIC BALANCE - Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, 4.05.10; <br />Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br />Drainage – Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br />
The URL can be used to link to this page
Your browser does not support the video tag.