My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-06-28_REVISION - M2016041
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2016041
>
2017-06-28_REVISION - M2016041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:54:17 PM
Creation date
6/28/2017 3:14:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016041
IBM Index Class Name
Revision
Doc Date
6/28/2017
Doc Name
Request for Technical Revision
From
Ames Construction
To
DRMS
Type & Sequence
TR1
Email Name
ECS
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit D <br />Applicant: Ames Construction, Inc. <br />Name of Site: Front Range Feed Lot Borrow <br />Date: July 27, 2016 (`rR#1 — June 26, 2017) <br />EXHIBIT D — Reclamation Plan <br />At the conclusion of the excavation activities, the site will be <br />reclaimed by grading the excavation slopes to a final gradient and the <br />excavation bottom to a uniform level. The vegetative growth support <br />material, temporarily stored in the perimeter berms, will be placed on the <br />excavation slopes and bottom. Additionally, due to the lack of <br />substantial topsoil at the site to begin with, Ames Construction may <br />choose to import topsoil from the adjacent construction project, to <br />assist in the topsoil replacement efforts. The constructed access road <br />will be removed and its' disturbed area included in the reclamation activities <br />— unless the property owner requests it be left for his future use. <br />A detailed description of the Reclamation Plan is as follows: <br />(1) <br />(a) Overburden replacement <br />There is no overburden to salvage and/or replace at this <br />operation. <br />(b) Reclaimed slope gradient <br />The reclaimed slopes will be constructed to a 3:1 <br />gradient. <br />(c) Revegetation measures to reclaim the site. <br />Ames will be utilizing Arnolds Agg to seed and we will <br />have them follow the reclamation plans the will utilized on <br />the Weld County Road 49 Project. <br />Prior to the placement and incorporation of the soil <br />amendments, the perimeter berm will be removed and the <br />berm material (vegetative support materials) will be <br />spread over the borrow slopes, bottom and site roadway <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.