Laserfiche WebLink
TABLE V-2 <br /> DESERADO MINE WATER IMPOUNDMENT STRUCTURES <br /> POND SIZE LOCATION DETAIL <br /> LOCATION I.D. NO. (ac-ft) TYPE PURPOSE DRAWING DRAWING <br /> DP-1* 7.0 Embankment Sediment Map 15 Map 34 <br /> "D" Portal PPA 0.23 In situ Emdeugency Map 15 Map 142 <br /> mp <br /> PP-2 5.5 Semi-in situ Process Map 15 Map 142 <br /> water settling <br /> RP-1 3.1 Semi-in situ Sediment Map 77 Map 78 <br /> Refuse Disposal RP-2/3 9.07 Semi-in situ Sediment Map 77A, 150 Map 80 <br /> Area RP-4 12.91 Semi-in situ Sediment Map 77A, 150 Map 80 <br /> RP-5 11.0 Semi-in situ Sediment Map 77A Map 80A <br /> Loadout RRA 0.77 Semi-in situ Sediment Map 103A 111 40 <br /> Loadout sump RRS-1 0.011 Semi-in situ Sediment Map 103A <br /> Slot Storage SS-1 1.4 Semi-in situ Sediment Map 112 <br /> SS-2 0.45 Semi-in situ Sediment Map 112 <br /> Halandras Landfill HSLA 0.016 Semi-in situ Sediment Map 136 <br /> SDH-2U Semi-in situ Sediment Map 147 <br /> D-Seam SDH-2L Semi-in situ Sediment Map 147 <br /> Down hole sump SDH-3U 0.68 <br /> ponds SDH-3M 0.48 Semi-in situ Sediment Map 147 Map 140 <br /> SDH-3L 0.31 Map 143 <br /> BSDP-1 0.17 Semi-in situ Sediment Map 157 Map 157 <br /> BSDP-2 0.20 Semi-in situ Sediment Map 157 Map 157 <br /> BSDP-3 0.16 Semi-in situ Sediment Map 157 Map 157 <br /> B-Seam Dewatering BSDP-4 0.20 Semi-in situ Sediment Map 157 Map 157 <br /> System#1 at SH-3 BSDP-5 0.75 Semi-in situ Sediment Map 157 Map 157 <br /> BSDP-6 0.97 Semi-in situ Sediment Map 157 Map 157 <br /> BSDP-7 0.99 Semi-in situ Sediment Map 157 Map 157 <br /> Last 1.20 Semi-in situ Sediment Map 157 Map 157 <br /> Chance <br /> BSD2-1 0.22 Semi-in situ Sediment Map 160 Map 160 <br /> B-Seam Dewatering BSD2-2 8.08 Semi-in situ Sediment Map 160 Map 160 <br /> System#2 at SH-4 BSD2-3 11.28 Semi-in situ Sediment Map 160 Map 160 <br /> BSD2-4 0.80 Semi-in situ Sediment Map 160 Map 160 <br /> BSD2-5 0.14 Semi-in situ Sediment Map 160 Map 160 <br /> East Portal EP-x NA Reclaimed Sediment Map 139 <br /> TS-1 0.011 Semi-in situ Sediment Map 109 <br /> Transfer buildings TS-2 0.007 Semi-in situ Sediment Map 111 <br /> TS-2A 0.14 Semi-in situ Sediment Map 147 Map 149 <br /> Raw Water Lagoon AL-1 13 Semi-in situ Storage Map 90 Map 91 <br /> * Impoundment structure has a portion of its embankment in excess of 10 feet in height and has been <br /> approved by the Office of the State Engineer,Colorado. <br /> Minor Revision MR-170 (03/2017) V-6 <br />