Laserfiche WebLink
FLAG RESOURCES, INC. <br />SILT PIT <br />RECLAMATION COST ESTIMATE (JUNE 19, 2017) <br />M-1981-202SG <br />acres total depth <br />31.30 ac <br />time factor <br />Depth to pump <br />20.00 ft <br />1,440.00 min/day <br />gal/acft <br />length slopes finished <br />4,900.00 Ift <br />325,900.00 gallacft <br />length slopes un finished <br />750.00 Ift <br />volume of 0.5h to 1v slope <br />100.00 ft"2 <br />volume of 2h to 1v slope <br />400.00 ft"2 <br />volume of 3h to 1v slope <br />800.00 ft^2 <br />ft <br />gallons per cu -ft. <br />7.48 g1ft^2 <br />pump cap/min <br />6,000.00 gpm <br />aquifer cap gpd <br />85,000.00 <br />gallons <br />Total depth _ <br />204,0131400.00 <br />3h <br />29,321,600.00 <br />h2 <br />1,690,480.00 <br />1/2h <br />561,000.00 <br />Total slopes <br />31,573,080.00 <br />total water <br />235,586,480.00 <br />722.88 acft <br />days <br />pump time 27.27 <br />SlopeConstruction time 5.39 <br />recharge factor 0.32 <br />TOTAL TIME 33.00 <br />Monthcost $64.03 per day <br />pump rent $1,921.00 per month <br />Diesel cost $0.000 per gal <br />Daily Fuel cost $0.00 per day <br />'40 hp motor elec cost $0.05 month <br />pump operat cost $1,921.00 month <br />day <br />cost $2,113.1 0 <br />