My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-06-27_REVISION - M1977227
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977227
>
2017-06-27_REVISION - M1977227
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:15:12 PM
Creation date
6/27/2017 4:11:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977227
IBM Index Class Name
Revision
Doc Date
6/27/2017
Doc Name
Request for Technical Revision
From
Super-Ex, LLC
To
DRMS
Type & Sequence
TR3
Email Name
LJW
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Request for Technical Revision <br />Permit M-1977-227 <br />Mesita Hili Mine <br />Revised Estimate of Reclamation Bond Amount <br />The existing bond amount is $67,462.00 dating from a time when some of the <br />revegetation and most reclamation earthwork were considered to be completed. <br />Under the proposed revision, with the redisturbance of some of the acreage, the <br />operator suggests that the bond may be adjusted following the estimate <br />below. This allows mining of phases, followed by reclamation, with no penalty for <br />reclaiming areas left unreclaimed. <br />The breakdown of revised reclamation costs is: <br />1. Direct Costs <br />Mobilization from Alamosa (75 mi ea way) $ 3,000. <br />Hauling overburden to next phase (5 ac, $.75/cy) $18,150. <br />Spreading overburden (.30/cy) $ 7,620. <br />Hauling growth medium to next phase (15 ac, $.50%y) $12,100. <br />Spreading growth medium (.25/cy) $ 6,050. <br />Seeding (15 ac, $1000/ac) $15,000. <br />Weed Control (2 ac, 150/ac) $ 300. <br />Subtotal: Direct Costs $62,220. <br />2. Indirect Costs <br />Indirect costs are approx. 20% of the direct costs. $12,444. <br />TOTAL_ revised reclamation costs: $74,664. <br />Super -Ex understands that, as final reclamation is carried out in the proposed <br />phase areas, the required bond amount may eventually be reduced. At that time, <br />the operator will request a bond reduction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.