Laserfiche WebLink
SNOWCAP COAL COMPANY, INC. <br />TABLE 3-7 <br />ROADSIDE NORTH & SOUTH MINES <br />PERMIT AREA ACREAGES <br />Permit Area <br />Surface Acreage <br />Mineral Acreage <br />Federal <br />44.7 <br />44.7 <br />Private <br />656.8 <br />687.8 <br />State <br />31 <br />0.0 <br />Total Permit Area <br />732.5 <br />732.5 <br />Disturbed Area* <br />Acreage <br />Roadside Borrow Area (Undermined) <br />1.1 <br />S Portal Light Use Road #1 <br />1.9 <br />Outfall 002 Piping <br />0.2 <br />North Decline (Undermined) <br />6.6 <br />Conveyor Corridor <br />0.3 <br />A Substation <br />0.2 <br />B Substation (Undermined) <br />0.3 <br />CBA 2 & Pond 11 <br />1.2 <br />CRDA 1 <br />2.2 <br />G Substation <br />0.6 <br />S Portal Hydrologic Communication Repair <br />0.4 <br />Total Disturbed <br />15.0 <br />Affected Area <br />Acreage <br />Underground Mining Activities & Disturbed Areas <br />306.3 <br />'Acres approved for Phase III Bond release have been removed from total. <br />RN -07 Rev 06/17 <br />