Laserfiche WebLink
TotalFirst Pit Infill4Exposed Groundwater2Mining3Processing4Dust Control4Process Ponds2,4Total (ac-ft)Jan 0.00 0.00 0.00 0.00 0.00 0.00 0.00Feb 0.00 0.00 0.00 0.00 0.00 0.00 0.00Mar 0.00 0.00 0.00 0.00 0.00 0.00 0.00Apr 3.43 0.10 0.00 1.22 1.17 0.22 6.14May 0.00 0.15 0.00 1.83 1.17 0.34 3.50Jun 0.00 0.20 0.00 1.83 1.17 0.44 3.64Jul 0.00 0.15 0.00 1.83 1.17 0.33 3.48Aug 0.00 0.11 0.00 1.83 1.17 0.25 3.36Sep 0.00 0.12 0.00 1.22 1.17 0.28 2.79Oct 0.00 0.08 0.00 1.22 1.17 0.18 2.65Nov 0.00 0.04 0.00 1.22 1.17 0.10 2.53Dec0.000.000.000.000.350.000.35Total3.430.960.0012.239.682.1528.451 All mining and milling related water consumption2 Based on Gross Evaporation Table and Settling Pond surface area.dewatering ditch surface area.3 Based on Operational Excavation Data. No material is mined below ground water.4 Based on Operational Consumption Data. No operations before April 2017Table 3: Instantaneous Depletions 2017OtherMining1