My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-06-08_REPORT - M1984036
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1984036
>
2017-06-08_REPORT - M1984036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2020 6:22:53 AM
Creation date
6/23/2017 8:15:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984036
IBM Index Class Name
REPORT
Doc Date
6/8/2017
Doc Name Note
Annual Fee and Map
Doc Name
Annual Fee/Report/Map
From
Varra Companies, Inc.
To
DRMS
Annual Report Year
2017
Email Name
PSH
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 6 <br /> 112c Annual Report <br /> Permit Number: M-1984-036 <br /> Permittee Name: Varra Companies, Inc. <br /> RECEIVED OperationName: Varra Resources Project 110 <br /> �� <br /> (formerly Dakolios Pit No. 1) <br /> JUN 0 8 County: Weld <br /> DIVISION OF MA'I'I Anniversary Date: June 1,2017 <br /> MIN EE P Current Bond Amt: $87,200.00 <br /> Annual Fee Due: $791.00 <br /> (DRMS Office Use <br /> D p <br /> e Only) Permit Acreage: 120.00 <br /> �V v �f al V�' DRMS Specialist: PSH <br /> L <br /> According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br /> the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land,required <br /> monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br /> anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year,the <br /> dates for the beginning of active operations, and the date active operations ceased for the year. <br /> Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If,while completing this report,you learn that your site is not in compliance with the rules and the <br /> act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> SUMMARY NARRATIVE: The permit was revised by Technical Revision(2010)and Amendment(2011)that typifies <br /> the remaining fill, site prep, reclamation, and warranty circumstances at play over the permitted lands. Approved <br /> reservoirs have had their perimeter's graded, soiled and seeded in prior reporting years. Impacts from flooding in <br /> 2013have been mitigated. Principle activity in 2014 completed grading along the northeast portion of the location and <br /> interseeding of resoiled areas. Completion of fill and grading to restore the ditch segment that intersects the parcel was <br /> completed in 2013-14, further identified as Area 3b, as shown on the included map. <br /> Weeds in 2012-13 were predominantly white top, an annual that is mechanically controlled along seeded slopes of <br /> reservoir perimeters as needed, and which appears less prevalent after treatment,and sparse in 2015,to the present. <br /> Reclamation was delayed in 2016-17, and is anticipated to near completion with the final resoiling and establishment of <br /> vegetation surrounding Areas 3a& 3b for 20117-18. This should limit future reclamation to the cost of interseeding areas <br /> where vegetation does not express itself within a three year period from the date of planting and justify significant <br /> warranty reduction. Post use of recycling materials and related stockpiles will continue as part of post reclamation <br /> activity and final end use. <br /> 1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES NO <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? YES NO <br /> If"YES,"please note time limits related to completion of reclamation, Rule 3.1.3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.